shower in adjacent existing buildingNC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Lyle Axelarris on Mar 4, 2016, 5:36 pm
Does anyone have any experience using the showers in an existing non-LEED building adjacent to the new LEED building for this credit? Both buildings are owned by the same agency and they have... Last reply: Sara Goenner Curlee, Dec 22, 2016, 9:57 am |
|
Low Mercury LampsNC-2009 IDc1: Innovation in Designposted by Michelle Rosenberger on May 18, 2017, 2:56 pm
It has always been my understanding, underscored by the LEEDuser LEED... Last reply: emily reese moody, Jul 8, 2021, 12:42 am |
|
(Sample) Lease AgreementCS-2009 EAp2: Minimum Energy Performanceposted by Charalampos Giannikopoulos on Feb 15, 2015, 11:33 am
If no tenants have been identified can the project owner claim relevant energy saving from reduced lighting power... Last reply: Marcus Sheffer, Dec 20, 2018, 5:10 pm |
|
Number of eligible Innovation credits from Pilot CreditsNC-v4 INc1: Innovationposted by Jason Garvens on Jan 15, 2018, 12:00 pm
Can anyone confirm the number of points that can be earned solely through achieving Pilot credits? The way I read the requirements in the Innovation section it would appear to be up to... Last reply: Afogreen Build, Apr 15, 2024, 8:59 pm |
|
Drawing ReviewNC-v4 EAp1: Fundamental commissioning and verificationposted by Steve Connelly on Mar 1, 2018, 9:18 am
Is a drawing review of the building envelope required by EAp1 Fundamental... Last reply: Scott Bowman, May 25, 2019, 12:12 am |
|
Are you using Environmental Materials Reporting Forms for the contractors?NC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Courtney Royal on Oct 28, 2020, 2:05 pm
In previous versions of LEED, we used Environmental Materials Reporting Forms for contractors to report information for the MR and IEQ credits. However, for v4 what are people typically using for... Last reply: Stephanie Gowing, Mar 27, 2024, 10:43 am |
|
EV Charger EnergyNC-v4 EAp2: Minimum Energy Performanceposted by Cory Duggin on Nov 19, 2021, 3:10 pm
Does the energy use for EV chargers have to be included in the energy model if you are going after the Electric Vehicles credit? I thought I had read somewhere that EV charger energy was... Last reply: Jamy Bacchus, Dec 1, 2021, 10:49 pm |
|
USGBC Overhauls Demand Response Pilot- in Response to CriticsPilot-Credits EApc8: Demand responseposted by Tristan Roberts on Jun 28, 2011, 5:33 am
My colleague Nadav Malin has been investigating this credit and just wrote up the following about it, which he emailed to me: Last reply: Daniel Whittet, Mar 22, 2013, 11:10 am |
|
Biophilic Design: Quantifiable MetricsPilot-Credits EQpc123: Designing with Nature, Biophilic Design for the Indoor Environmentposted by LEED Team DC on Jan 30, 2019, 10:57 am
Hi, I'm wondering if there are shareable examples of a project team documenting quantifiable biophilic metrics. I'm inclined to think these metrics could be gained either noting dimensions... Last reply: Adriana Hansen, Oct 28, 2021, 3:37 pm |
|
leed pilot credits- we need your help!Pilot-Credits PC9: Street Networkposted by brendan owens on Sep 9, 2010, 11:27 am
Hi LEEDusers - The idea behind pilot credits is to get feedback from project team members on the concepts we're testing so that USGBC can learn from your experience and make these credits... Last reply: Nicholas Swinehart, May 6, 2013, 10:44 am |