Renewable energy production DES Path 1

NC-v4 EAc5: Renewable energy production
posted by Lisa Loreti on Jan 29, 2020, 3:37 am

We are modeling a building connected to a...

Last reply: Tyler Thumma, Feb 14, 2020, 8:46 am

Campus Thermal Energy System- Multiple Buildings

NC-v4 EAp2: Minimum Energy Performance
posted by Senna Sabir on Dec 25, 2019, 4:00 am

Hello,

We are working on a campus project that contains multiple NC and F&B CS buildings. We'll be registering the master site and the individual buildings under the campus approach. A...

Last reply: Tyler Thumma, Feb 14, 2020, 8:25 am

Obtaining a Cx Plan and Project Drawings

EBOM-v4.1 EAc3: Grid Harmonization
posted by Kyle Renz on Feb 6, 2020, 11:46 am

I'm an undergraduate student at Florida Tech working with a group of professors to help commission the new net-zero energy alumni center on campus. My professors were curious if it's possible to...

Last reply: David Hubka, Feb 14, 2020, 7:47 am

LCA for a renovated building?

NC-v4 MRc1: Building life-cycle impact reduction
posted by Agata Mozer on Feb 14, 2020, 6:02 am

Can Option 4 LCA be selected for a project of an existing building which is being renovated and with substantial demolition works? Is it still allowed to use Option 4 if a bit more than 25% of...

Squat WC using manual flushing

Warehouses-NC-v4 WEp2: Indoor water use reduction
posted by Iqbal K. on Feb 13, 2020, 4:19 am

Dear All,

We have 2 nos of squat toilet within the development for the security and driver room. However, the flushing system will be manual using bucket. 

How to justify the WC...

Last reply: emily reese moody, Feb 14, 2020, 12:21 am

Car and motorcycle parkings

CS-v4 LTc7: Reduced parking footprint
posted by Emmanuel Pauwels on Dec 11, 2017, 5:23 am

For this credit, are motorcycle parkings spaces also included or only car parking?

Last reply: Summer Minchew, Feb 13, 2020, 2:59 pm

Trucks parking

CS-v4 LTc7: Reduced parking footprint
posted by Mauricio Ramirez on Feb 10, 2020, 5:08 pm

Hi there!

We are working in a warehouse project Core&Shell v4 and the project has two spaces for parking: one is for the employees and visitors and the other is for trucks with 24 hour...

Last reply: Summer Minchew, Feb 13, 2020, 2:42 pm

Light reflection from the facade

NC-v4 SSc6: Light Pollution Reduction
posted by Agata Mozer on Feb 13, 2020, 5:16 am

Ligting engineer asked me if he should include light reflection from the facade in the ligthing simulation for Light trespass Option 2. Could anyone confirm this? Our project is in LZ2 and is a...

Last reply: Bill Swanson, Feb 13, 2020, 8:35 am

roof under ventilation ducts and glass overhang

NC-v4 SSc5: Heat Island Reduction
posted by Agata Mozer on Dec 12, 2019, 5:34 am

I have two questions regarding heat island reduction credit:

1. I would like to confirm if in LEEDv4...

Last reply: emily reese moody, Feb 13, 2020, 1:15 am

WC's in expansion

NC-v4 WEp2: Indoor water use reduction
posted by Ricardo Sá on Feb 11, 2020, 11:52 am

Dear All,

 
One of our clients is developing an expansion to an existing airport.

The scope of this expansion includes an area of new WCs (around 550...

Last reply: David Posada, Feb 12, 2020, 8:50 pm