Forum » NC-2009 EAc3
Topic

Who may contract "Construction manager not holding contracts"?

NC-2009 EAc3: Enhanced Commissioning
posted by Jean Marais on May 26, 2010, 1:15 am

Am I right in understanding that for Enhanced Commissioing only the following may subcontract the...

Last reply: Bethany Beers, Nov 1, 2011, 6:28 pm

LEED Commissioning vs. "Total Building Commissioning" (TBCx)

NC-2009 EAc3: Enhanced Commissioning
posted by Matt Nolan on Jun 3, 2011, 6:41 pm

I am seeing more and more project requirements (for new buildings) mentioning TBCx (Total Building Commissioning)- which is based on ASHRAE Guideline 0. I'm not real familiar with it, and don't...

Last reply: Gary Shlifer MS, LEED AP BD+C, Homes, Jun 30, 2011, 12:01 pm

Supervising the Commissioning of 20% of the energy systems

NC-2009 EAc3: Enhanced Commissioning
posted by Maya Karkour on Mar 22, 2011, 5:18 am

Hello,

We are working on a project in which all the energy systems will be installed, tested and balanced by the general contractor. However, as per the requirements of this credit, the...

Last reply: Chris Ladner, Apr 26, 2011, 8:48 am

Late Enhanced Comissioning

NC-2009 EAc3: Enhanced Commissioning
posted by Carolina Vergnano on Mar 16, 2011, 12:36 pm

Does exist any time limit between the construction conclusion and the start of enhanced comissioning?
i.e. To comply to this credit, can I contract the enhanced comissioning in a building...

Last reply: Chris Ladner, Apr 26, 2011, 8:42 am

DES Commissioning

NC-2009 EAc3: Enhanced Commissioning
posted by Margaret Montgomery on Mar 24, 2011, 4:03 pm

We're looking at a project where we do meet all the conditions for enhanced...

Last reply: Chris Ladner, Apr 26, 2011, 8:37 am

Enhanced CX 'Design Firm'

NC-2009 EAc3: Enhanced Commissioning
posted by Julianne Laue on Feb 18, 2011, 12:03 pm

If a firm is a AE firm and are signing the arch drawings, but not involved in MEP...can an engineer in the firm be the CX?

Last reply: Keith Steurer, Mar 30, 2011, 4:20 pm

Team roles and responsibilities

NC-2009 EAc3: Enhanced Commissioning
posted by Kath Williams on Feb 11, 2010, 4:27 pm

House of Representatives LEEDuser Expert 11474 thumbs up February 17, 2011- 2:57 pm Not your fault... we just inverted the forum last week so that new comments are first. Thanks for participating. Log...

Last reply: Tristan Roberts, Feb 17, 2011, 2:57 pm

UPS system need to be commissioned?

NC-2009 EAc3: Enhanced Commissioning
posted by Eric JS on Jan 30, 2011, 3:33 am

Hi all,

UPS system is used as a back up power in case if there is power failure. In that case. UPS itself consume small amount of power. In that case, do we include this in commisioning...

Last reply: mike lackey, Jan 30, 2011, 3:09 pm

Refrigeration commissioning

NC-2009 EAc3: Enhanced Commissioning
posted by Brian Farrelly on Jan 7, 2011, 11:29 am

Hi,
We are carrying out Ehanced Commissioning EAc3 on a large recreation centre which is made up of an ice rink, swimming pool, gym, offices etc. Under LEED EAc1 the ice rink plant is...

Last reply: Chris Ladner, Jan 21, 2011, 8:53 am

Upload whole system manual?

NC-2009 EAc3: Enhanced Commissioning
posted by Jorng-ren Chern on Dec 29, 2010, 7:34 am

The EA C3 credit form require us to upload system manual.

The project I am working is a large clean room project. The capacity of the HVAC system is huge and so are the system manuals. My...

Last reply: Scott Bowman, Dec 29, 2010, 8:33 am