Forum » NC-2009 EAp1
Topic

Confirmation of Commissioning Experience

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Scott Rosch on Apr 10, 2012, 2:45 pm

Given the subjective nature of LEED credit reviews, and the fact that a contract for...

Last reply: Scott Bowman, Sep 12, 2012, 2:24 pm

Absolute 50% CDs for Enhanced Commissioning?

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Nicole Ferrini on Jun 7, 2012, 5:17 pm

Dylan Connelly Mechanical Engineer Integral Group LEEDuser Expert 472 thumbs up June 8, 2012- 12:07 pm Nicole, This is actually a question for the EAc3 forum. There are no design document review requirements for the fundamental commissioning agent. The requirement for LEED is that the Enhanced CxA conduct a commissioning design review of the "design documents prior to the mid-construction documents phase and back-check the review comments in the subsequent design submission." In my experience 75% CD is not too late to be considered a mid-CD review. There are times when project deliveries skip...

Last reply: Scott Bowman, Sep 12, 2012, 2:22 pm

Sample Commisioned Projects Criteria

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Jalal Avades on Aug 20, 2012, 6:58 pm

What are the requirements/criteria to meet the 'Representative Projects'? to qualify as a Commissioning Agent under LEED?

When you fill the fields for sample project, does it matter what...

Last reply: Chris Ladner, Aug 21, 2012, 8:36 am

EAp1 Fundamental commissioning domestic hot water question

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Andrew Cooper on Jul 11, 2012, 3:21 pm

Hello, I have a project in which I commissioned and the review comments came back that I did not include the kitchen sinks in my scope of work for the domestic hot water systems? All the...

Last reply: Emmanuel Pauwels, Aug 20, 2012, 8:11 am

Hotel

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Nelina Loiselle on Jul 7, 2012, 5:19 pm

To satisfy the LEED requirements, does every room in a hotel have to be commissioned?

When Fundemental Commissioning Should start

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Jalal Avades on May 10, 2012, 4:37 pm

We have a project that is currently in construction and the client would like to go LEED. When during project timelline does...

Last reply: Dylan Connelly, May 15, 2012, 9:53 pm

Criteria of choosing CxA

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Patana Rattananavathong on Jan 25, 2012, 10:38 pm

There are about 3...

Last reply: Tristan Roberts, Apr 6, 2012, 1:33 pm

Commissioning Authority (CxA) Regional experience?

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Ameet AA on Jan 11, 2012, 5:45 am

LEED user guide states that the...

Last reply: Chris Ladner, Jan 12, 2012, 9:12 am

Commissioning for overseas projects

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Natalie Tan on Jan 2, 2012, 4:04 pm

Hi, we have a small USGBC LEED-NC project (400m2) in Kuwait where the Owner wants us (LEED Consultancy firm in Canada) to hire a...

Last reply: Chris Ladner, Jan 11, 2012, 8:56 am

EA Pre-requ. #1

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Jason Dohl on Sep 4, 2009, 1:45 pm

I am gearing up to put a Design-Build team together for a 6000 SF commercial building and our goal is Silver. To achieve the pre-req, can our Commissioning Authority be an experienced Design-...

Last reply: Ameet AA, Jan 11, 2012, 5:48 am