Differences between design phase and construction phaseNC-v4 MPR3: Must comply with project size requirementsposted by JORDI CASTELLANO on Oct 15, 2018, 4:09 am
hello everyone, Last reply: Tristan Roberts, Oct 15, 2018, 3:48 pm |
|
Lighting controls requirementsSchools-2009 IEQc6.1: Controllability of systems - lightingposted by Marina Curto on Oct 5, 2018, 2:07 am
Hi everyone, I'm working on a School project in v2009 and I have some doubts whether the lighting controls design would meet credit requirements. I have two different cases: -... |
|
Non potable water for irrigation and toilets flushNC-2009 WEc1: Water Efficient Landscapingposted by Karyn Rodrigues on Aug 10, 2018, 5:36 am
Hello! I have two sources of non-potable water in the project: gray and rainwater. These two sources, combined, are enough to supply my irrigation demand and also toilets flush for the... |
|
Bike spaces usageNC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Karyn Rodrigues on Jul 24, 2018, 4:02 am
Hello! I have a LEED NC project that is already operating and we are now finishing... Last reply: Emily Purcell, Jul 24, 2018, 9:32 am |
|
How many strategies are necessary to comply with Option 2?CI-v4 EQc1: Enhanced indoor air quality strategiesposted by Raquel Clemente on Jul 18, 2018, 6:57 am
Hello, The LEED CI guide states: Option 2. Additional enhanced... |
|
Split certification doubtsLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Marina Curto on Jun 21, 2018, 6:56 am
Good morning, Last reply: RETIRED, Jun 21, 2018, 10:17 am |
|
Outdoor airNC-v4 EAp2: Minimum Energy Performanceposted by Emmanuel Pauwels on Apr 4, 2016, 12:31 pm
In exception C in section G3.1.2.6 Ventilation, it states that 'If the minimum outdoor air intake flow in the proposed design is provided in excess of the amount required by the rating authority... Last reply: Marcus Sheffer, Jun 15, 2018, 11:52 am |
|
Changing rooms in adjacent LEED buildingNC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Instra Ingenieros on Jun 30, 2017, 4:57 am
We have a project with an existing LEED adjacent building to the new LEED building. Both buildings are conected by the interior and the exterior and owned by the same landlord. The... Last reply: Sophie Kerr, Apr 30, 2018, 12:25 pm |
|
Kitchen FaucetsNC-2009 WEp1: Water Use Reductionposted by Angel Vega on Dec 14, 2016, 2:27 pm
The building I am trying to obtain the certification for, is a museum. It has two rooms with faucets for the cleaning staff. Are these faucets into the objetive of reduction? Last reply: Gerren Wagner, Apr 19, 2018, 4:55 pm |
|
Paper and CardboardNC-v4 MRp1: Storage and Collection of Recyclablesposted by Helena Garcia on May 17, 2016, 6:11 am
According to the LEED guides the paper and cardboard are recycled separately. In the case of Europe they are not, they are recycled together and treat it in the corresponding center. Last reply: Berry Taylor, Apr 16, 2018, 3:59 pm |