Topic | Recent |
---|---|
ASHRAE 90.1-2010- Unmet hoursCS-v4 EAp2: Minimum Energy Performanceposted by Giuseppina Amorusi on Sep 7, 2017, 6:17 am
Hi all, I’m modeling for a project under LEED CS v4 according to ASHRAE 90.1-2010. I know that unmet hours shall not exceed 300 . In LEED 2009 in accordance to ASHRAE 90.1-... Last reply: Marcus Sheffer, Mar 5, 2018, 10:53 am |
|
step controls per Section 9.4.1.2aNC-v4 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Feb 8, 2018, 9:43 am
The v4_Minimum Energy Performance Calculator_v05 states that "Mandatory step controls are included in the proposed, and modeled in the baseline for all spaces enclosed by ceiling height... Last reply: Francesco Passerini, Feb 15, 2018, 3:15 am |
|
DES Path 1NC-v4 EAc7: Green power and carbon offsetsposted by Francesco Passerini on Feb 14, 2018, 10:36 am
The Reference Guide at p. 460 states: "For any projects using energy model Path 1,... Last reply: Marcus Sheffer, Feb 14, 2018, 12:33 pm |
|
renewable energy sold to the gridNC-v4 EAc2: Optimize Energy Performanceposted by Francesco Passerini on Feb 8, 2018, 9:57 am
In order to calculated the points relative to NC-v4 EAc2 - Optimize energy performance shall the produced electric energy from a renewable source that is sold to the national grid be... Last reply: Marcus Sheffer, Feb 12, 2018, 3:01 pm |
|
Daylighting controls for primary sidelighted areas for baselineNC-v4 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Jan 29, 2018, 11:26 am
In the refurbishment that was designed internal partitions will be removed and the rooms will become bigger than the existing ones. Because of that, in many cases the primary sidelighted areas... Last reply: Marcus Sheffer, Feb 5, 2018, 12:50 pm |
|
Community contaminant prevention- Airborne ReleasesNC-v4 INc1: Innovationposted by alessandro santuari on Jan 17, 2018, 9:59 am
Greetings, Last reply: Trista Little, Feb 2, 2018, 7:26 pm |
|
Short term bicycle storageNC-v4 LTc6: Bicycle facilitiesposted by Deerns Italia on Nov 10, 2017, 10:08 am
Hello everybody, I'm currently working on an building extension project where the main entrance of the existing building is located in front of a street (the area in front of the entrance... Last reply: Calie Gihl, Jan 22, 2018, 12:40 pm |
|
% of Herbs requiredPilot-Credits SSpc82: Local food productionposted by Francesco Passerini on Jan 15, 2018, 9:24 am
Hello, we want to pursue this credit, but we have a doubt. Under all project description says "Herbs used for food preparation shall not exceed 25% of the area requirement. All projects shall... Last reply: Kristi Ennis, Jan 15, 2018, 10:35 am |
|
LEED project boundaryCS-v4 MPR2: Must use reasonable LEED boundariesposted by Francesco Passerini on Jan 9, 2018, 6:33 am
The site area of our project has some differences between ground floor and the basement: the basement area is higher than the ground floor area. Could we consider different LEED boundaries areas... Last reply: Francesco Passerini, Jan 12, 2018, 4:33 am |
|
Threat Factor CalculationPilot-Credits SSpc55: Bird collision deterrenceposted by Francesco Passerini on Jan 10, 2018, 10:25 am
Hi I've been working on a project where I want to purse this pilot credit. I only have few information on glass, just the thermal transmittance and the solar factor (which is 0.35). I've been... Last reply: Nadav Malin, Jan 11, 2018, 9:52 am |