Topic | Recent |
---|---|
Operable windows-ground floor or upperfloor?NC-v4 EQp2: Environmental tobacco smoke controlposted by Florian Schmidtchen on Jun 2, 2017, 10:26 am
Dear Sir or Madam, Last reply: Trista Brown, Aug 14, 2017, 7:59 pm |
|
Elevator lobbies-with airlocks?NC-v4 EQc1: Enhanced indoor air quality strategiesposted by Florian Schmidtchen on Aug 9, 2017, 11:44 am
Dear all, We have mechanically ventilated spaces. For the option 1 we therefore have to comply with the requirement B. interior cross-contamination prevention. To create negative pressure... |
|
Operable windows in lieu of controls- what about WOCDsCS-2009 IEQc6: Controllability of systems - thermal comfortposted by Andreas Hintz on Jul 26, 2017, 9:02 am
For determing the openable wall area (which has to be a minimum of 4% of the net occupiable floor area) should WOCDs (Window Opening Control Devices) be considered? Please explain how to... Last reply: Lauren Sparandara, Aug 7, 2017, 1:46 pm |
|
WarehouseCI-2009 IEQp1: Minimum indoor air quality performanceposted by Anke Koch on Mar 11, 2015, 5:35 am
Dear LEED community, Last reply: Andrew Mitchell, P.E., Aug 6, 2017, 9:28 pm |
|
Irrigation type definitionsNC-v4 WEp1: Outdoor water use reductionposted by Jens Apel on Jul 13, 2017, 9:37 am
Does anyone know if there are definitions for the different irrigation types? Especially the differences between the two drip types would be of interested. |
|
STC rating for the combination office- hallwayNC-v4 EQc9: Acoustic performanceposted by Florian Schmidtchen on Jun 2, 2017, 11:24 am
Dear all, |
|
Waste Heat from Landfill Gas PlantNC-v4 EAp2: Minimum Energy Performanceposted by Aaron Luthien on May 10, 2017, 11:10 am
Hello all, We have an office project which utilizes waste heat from the neighbor landfill gas plant. The plant and office is owned by the same company. The plant produces electricity from... Last reply: Aaron Luthien, May 26, 2017, 10:48 am |
|
Tenant Area ModelingCS-v4 EAp2: Minimum Energy Performanceposted by Aaron Luthien on May 5, 2017, 8:45 am
Hello all, We have a C&S office project where the owner prepares technical infrastructure for VRF heating cooling system in tenant area. All tenants are obligated to use VRF system... Last reply: Marcus Sheffer, May 5, 2017, 9:45 am |
|
Taxi service to function as private shuttlesNC-2009 SSc4.1: Alternative transportation - public transportation accessposted by Dustin Schoen on Mar 29, 2017, 9:42 am
Our project is located in an urban environment, we are just a few yards short of fulfilling the requirements. Our project is expected to have as little as 5 FTEs, potentially even less. Do you... Last reply: Kathryn West, Apr 3, 2017, 9:05 pm |
|
Clear definition for interior/exterior neededNC-v4 EQc2: Low-emitting materialsposted by Björn Schön on Feb 17, 2017, 1:58 am
The Definition of interior/exterior in the LOW-EMITTING MATERIALS credit is a bit confusing for me. What is exaclty defined as a waterproofing membrane or air- and water-resistive barrier... Last reply: Michelle Halle Stern, Feb 19, 2017, 12:49 am |