Topic | Recent |
---|---|
Decentralized PM measuring devices permanent installationNC-v4.1 EQc4: Indoor air quality assessmentposted by Sascha Krause on Mar 3, 2021, 9:48 am
Hello all, It's first time that I work with LEED regulations and can't find something about permament installation of PM measuring devices and whether installed devices can improve the... |
|
Base building versus tenant meteringCS-v4 EAp3: Building-level energy meteringposted by Jens Apel on Jul 18, 2017, 8:52 am
Maybe I am overly cautious, but I would like to clarify the following. The Ref.Guide states "... Last reply: Kristina K, Feb 19, 2021, 10:35 am |
|
Leedonline-question concerning the registrationLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Stephan Zweig on Oct 21, 2020, 5:49 am
Hello to all users, 1. In Leed online at the regitration form I see the option LEED BD+C v4, and LEED BD+C v4.1. Can I register the project under LEED v4 BD+C New... Last reply: Konstantina Kalliakoudi, Oct 29, 2020, 9:02 am |
|
Change of rating system during certification progressLEED Rating System Selectionposted by louise renesme on Oct 16, 2020, 10:38 am
Is it possible to change our rating system even if our design review has already been submitted and we got the feedback ? Our project is currently under the LEED NC 2009 BD+C... |
|
Koolshade as glare-controlNC-v4 EQc8: Quality Viewsposted by Audrey LEDESERT on Aug 27, 2020, 2:15 amOf course, I won't redirect the reviewer to a website, it was just for illustrating the product for the forum. Concerning this criterion, I just have an uncertainty about the "obstructed view"... Last reply: Audrey LEDESERT, Aug 31, 2020, 3:52 am |
|
how is considered Paris’ tramway?CS-v4 LTc5: Access to quality transitposted by Marion THIBAULT on Jun 23, 2020, 11:47 am
Hi everyone, I have some trouble to determine if the Paris’ tramway corresponds to a... Last reply: Tony Grace, Aug 26, 2020, 9:45 am |
|
Ventilation of parking garagesCS-v4 EAp2: Minimum Energy Performanceposted by Sarah Leenknegt on Mar 11, 2019, 7:51 am
Hi We are modelling an office building in Switzerland with LEED v4 Core and Shell and have a question regarding the required ventilation rate for parking garages. According to ASHRAE 62.1... Last reply: Tyler Thumma, Aug 21, 2020, 11:38 am |
|
ACP- No Cooling Tower (Core & Shell v4)CS-v4 WEc3: Cooling tower water useposted by Anke Koch on Dec 12, 2017, 3:38 am(https://leeduser.buildinggreen.com/forum/acp-no-cooling-tower-core-shell-v4) also confirms my understanding of the interpretation. Log in or register to post comments ... Last reply: Erkki Seinre, Aug 6, 2020, 9:13 am |
|
LEED online Substitution v4.1 for v4 MRC1: Submit 4 Points for Option 4 Path 4?NC-v4.1 MRc1: Building life-cycle impact reductionposted by J Schütz on Mar 20, 2020, 9:02 am
Dear all, as our project meets the requirements of Path 4, we like to submit 4 Points in LEED online. For Option 4 under LEED v4 only 3 Points are available at the thresholds. Is it... Last reply: J Schütz, Aug 5, 2020, 1:49 am |
|
Has anybody used microlouvers already?NC-v4 EQc6: Interior lightingposted by Pierre-Antoine Legrand on Jul 30, 2020, 5:12 am
I am trying to figure out how to integrate microlouvers in a double-skin façade. The architect has decided that only 50% of the louvers would be operated by the user... Does... |