Log in
Forum » Europe – Western
Loading...
Topic

Hybrid recooler

NC-v4 WEc3: Cooling tower water use
posted by Florian Schmidtchen on Aug 8, 2017, 6:05 am

Dear all,

Our MEP Engineer wants to implement a dual recooling system/the hybrid recooler of the series KAVH. For our building type and the location in Germany with strong temperature...

Last reply: Ben Stanley, Aug 28, 2017, 8:04 pm

Conservation Organization compliance for Option 2

CS-v4 SSc2: Site development - protect or restore habitat
posted by Kévin THIZY on Feb 2, 2017, 9:39 am

Hi,

In order to satisfy Option 2 - Financial support - requirements for our project (location : near Paris, France), we selected a conservation organization regionally and nationally...

Last reply: emily reese moody, Aug 27, 2017, 6:00 pm

Finished wood

CI-v4 EQc2: Low emitting materials
posted by Devani PERERA on May 17, 2017, 9:18 am

A finished...

Last reply: Reinhard Oppl, Aug 27, 2017, 8:38 am

LEED for office with few modifications

CI-v4 MPR3: Must comply with project size requirements
posted by Devani PERERA on May 4, 2017, 6:07 am

A project I assess is seeking LEED v4 CI Silver. It is a 5877,1sqft rented office, in an existing building (previously certified Breeam in-use), that is undergoing fit-out (minor improvements =...

Last reply: Tristan Roberts, Aug 26, 2017, 2:03 pm

Certify only one floor among three floors that are rented

CI-v4 MPR2: Must use reasonable LEED boundaries
posted by Diana Nezamutinova on Jun 21, 2017, 10:12 am

Would you please advise if one newly acquired floor of a 3-floor office eligible to get certified under LEED v.4 Commercial Interiors (see details below)?

- A company XYZ has been renting...

Last reply: Tristan Roberts, Aug 26, 2017, 2:01 pm

Conditions for site fence

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Julian Bork on Apr 27, 2017, 9:51 am

Hello everybody
I have a question about the construction fence as a part of the...

Last reply: Tristan Roberts, Aug 26, 2017, 10:12 am

Connected underground car parks

NC-v4 LTc7: Reduced parking footprint
posted by Florian Schmidtchen on Apr 4, 2017, 11:56 am

Dear all. We are working on a LEED v4 NC campus project in which two (office) buildings pursuing a LEED certification. In the course of constructing the buildings will provided with two...

Last reply: Tristan Roberts, Aug 26, 2017, 8:55 am

Extent of European ACP application

NC-v4 EQp1: Minimum indoor air quality performance
posted by Jens Apel on Jun 26, 2017, 4:49 am

I am not quite sure on the wording regarding natural ventilation and the Europe ACP.
The online Ref.Guide states
"Projects in Europe may use Arbeitsstaettenrichtlinie ASR 5 as a local...

Last reply: Michelle Reott, Aug 15, 2017, 11:53 am

Operable windows-ground floor or upperfloor?

NC-v4 EQp2: Environmental tobacco smoke control
posted by Florian Schmidtchen on Jun 2, 2017, 10:26 am

Dear Sir or Madam,
Smoking must be prohibited within 25 feet of building entries, outdoor air intakes, and operable windows. A designated smoking area must be located at least 25 feet away...

Last reply: Trista Little, Aug 14, 2017, 7:59 pm

LED integrated in facade window frame/ MLO lighting zone

NC-v4 SSc6: Light Pollution Reduction
posted by Ilse Dijkstra-Nugteren on Aug 11, 2017, 4:42 am

We are working on the LEED V4 certification of a project which will be located at the border of a business park and about 3 kilometers away from highways and an international airport. Between the...

Last reply: Bill Swanson, Aug 11, 2017, 8:33 am