Topic | Recent |
---|---|
Submetering the pool and dialysisNC-v4 WEc4: Water meteringposted by Eslam Elshorbagy on Jan 25, 2024, 11:56 am
Hi. We have a building that is half a fitness facility and the other half a medical clinic. We intend to submeter the pool in the fitness facility and the dialysis equipment in the... |
|
Purchasing Policy PrerequisiteEBOM-v4.1 MRp1: Purchasing Policyposted by Sean Smith on Jan 25, 2024, 10:32 am
I'm working on a project where the property manager told us the only on-going purchases for the buliding are cleaning supplies (brooms, garbage bags, gloves) and all other purchases are tenant... |
|
How to tell if the chemical inventory of a product is disclosed to 0.1% (1000ppm)NC-v4 MRc4: Building product disclosure and optimization - material ingredientsposted by Ashley Hu on Jun 19, 2018, 7:51 pm
Hello there, Option 1 accepts the following as documentation:
Last reply: Megan Bodin, Jan 24, 2024, 5:21 pm |
|
LEED O+M v4 Warehouses and Distribution CentersLEED Rating System Selectionposted by Ralph Bicknese on Jan 24, 2024, 1:16 pm
We are evaluating utilizing LEED O+M for Warehouses and Distribution Centers for a 1.5M sf Distribution Center where the all parties are very interested in being able to achieve a LEED rating and... |
|
Hiring- LEED Project AdministratorHelp Wanted: LEED-related Jobsposted by Trisha Highnote on Jan 17, 2024, 11:12 am
Rennell Associates, LLC, is seeking a candidate to join our team as LEED® PROJECT ADMINISTRATOR. We seek a person with three or more years of experience in sustainable design and construction to... |
|
Sample testing required?Pilot-Credits INpc137: Cleaning and Disinfecting Your Space for Emerging Pathogensposted by on Sep 19, 2023, 12:48 pm
Hello everyone, Looking to understand better the requirements on the Sample testings side for this pilot credit. Do we need to submit an actual testing sample performed, with results? or... Last reply: Glen Boldt, Jan 16, 2024, 9:08 pm |
|
Baseline ExamplePilot-Credits IPpc93: Prevention through designposted by Logan McNeil on Mar 22, 2019, 5:48 pm
Our project (UCSF Block 33, SF CA) has found this credit to be worthwhile to pursue, as safety should live in every aspect of a construction project. However, the team noted that it would have... Last reply: Dionisio Franca, Jan 15, 2024, 3:41 am |
|
MasticNC-v4.1 EQc4: Indoor air quality assessmentposted by Michelle Lockert on Jan 11, 2024, 2:04 pm
Can anyone tell me if it is okay to utilize mastic “outside” the building envelope? Thank you. Last reply: Gregor Braugman, Jan 13, 2024, 11:04 pm |
|
INpc155- Design for Indoor Air Quality and Infection ControlCS-v4 INc1: Innovationposted by Sustainability & Commissioning on Apr 25, 2023, 2:10 pm
Hi all, The Pilot Credit: Design for... Last reply: Dina El-Sady, Jan 13, 2024, 1:45 pm |
|
Pilot-Credits EQpc57: Enhanced acoustical performance- exterior noise controlPilot-Credits EQpc57: Enhanced acoustical performance - exterior noise controlposted by Olawale Taiwo on Jan 12, 2024, 12:45 pm
Hello Sound & Acoustic Specialist (LEED APs), Please I need a quick confirmation on this Pilot credit EQpc57. Does this Pilot credit EQpc57, still apply to LEED v4.1 BD+C:NC... |