Log in
Forum » U.S. and Canada
Topic

Monitoring and Corrective action plan

Pilot-Credits SSpc55: Bird collision deterrence
posted by Luis Huertas on Apr 21, 2017, 10:14 am

I am working on developing the required monitoring plan, but in conversations with the American Bird Conservation manager, drafting a plan for a new building cannot be drafted in the way the...

Last reply: Michael Shea, Aug 23, 2020, 7:14 pm

New Retail space in an existing mall

Retail-CI-v4 LTc5: Reduced parking footprint
posted by BEE Incorporations on Aug 23, 2020, 7:08 am

We are designing a retail space that is evaluating this credit. The retail space is in a mall which has designated parking area for store employees only.

How do we calculate the parking...

LEED v4.1, ARC and Minimum Requirement Entries

EBOM-v4.1 EQp1: Minimum Indoor Air Quality
posted by Ann Gallogly on Aug 21, 2020, 12:57 pm

I'm a first time LEED project coordinator using the ARC platform to recertify a Existing Building O+M project. Prior to August 15th, 2020 ARC's platform had a way to attach LEED requirements...

Tenant lighting savings with local code (T24) requirements

CS-v4 EAp2: Minimum Energy Performance
posted by Maria Grimm on May 27, 2019, 11:15 pm

Is it possible to claim tenant lighting savings due to local code requirements, without a signed tenant lease agreement? I'm working on a project in California and the LPDs in the tenant office...

Last reply: Tyler Thumma, Aug 21, 2020, 11:26 am

MRpc87 Verified Construction and Demo Recycling Rates

NC-v4 INc1: Innovation
posted by Marie Bizzak on Jul 29, 2020, 6:05 pm

Trista Little Senior Consultant WSP USA LEEDuser Expert 376 thumbs up July 30, 2020- 12:45 pm Hi Marie- for (b) you should post on the MRpc87 LEEDuser forum (observations about the process or requirements, ideas for improvement, questions, etc) and take a screenshot of the post to include in your application. For (c) you should get a survey completion email that you can include in your application. Log in or register to post comments Hrisa Gatzoulis Senior Project Manager JLL LEEDuser Premium Member 1 thumbs up August 4, 2020- 5:12 pm You can find the credit-specific pilot credit documentation...

Last reply: emily reese moody, Aug 20, 2020, 4:34 pm

Pilot-Credits EQpc116: Daylight in nonregularly occupied spaces

NC-v4 INc1: Innovation
posted by Marie Bizzak on Aug 20, 2020, 9:13 am

I am working on Daylight in Nonregularly Occupied Spaces. The project is also pursuing Daylight in Regularly Occupied Spaces. My questions pertains to the definition of "Un/Occupied Spaces". LEED...

Last reply: Alara Matsyk, Aug 20, 2020, 9:46 am

Soil testing to document restoration

NC-v4 SSc2: Site development - protect or restore habitat
posted by Beth Johannessen on Aug 18, 2020, 10:46 am

Is a soil test needed both before and AFTER construction to show that soil has been restored? We are tyring to understand how to document the restoration of the soil. We completed soil tests...

Heat Island Reduction

NC-v4 SSc5: Heat Island Reduction
posted by Marie Bizzak on Aug 13, 2020, 6:28 pm

credits, sign and date. This is why I reached out to the LEEDUser Forum. I was hoping someone could help? Log in or register to post comments emily reese moody Sustainability Director, Certifications &...

Last reply: emily reese moody, Aug 18, 2020, 5:19 am

Fleet parking

NC-v4.1 LTc7: Reduced parking footprint
posted by Erica Downs on Aug 14, 2020, 4:39 pm

v4.1 credit language no longer mentions subtracting out fleet vehicle parking, as in v4. Anyone know if this is still allowed?  Or must all parking be included, even fleet vehicles not used for...

Last reply: Erica Downs, Aug 17, 2020, 4:23 pm

Low-flow WaterSense Devices

NC-v4 WEp2: Indoor water use reduction
posted by MAUDE PINTAL on Jun 15, 2020, 3:16 pm

Hello

Do you know models of bathroom faucets with a 0.5 gm flow that is WaterSense certified or certified aerators that can get the same flow?

Thank you,

Last reply: Susan Di Giulio, Aug 17, 2020, 2:32 pm