Log in
Forum » Poland
Loading...
Topic

Sensors calibration during the performace period

EBOM-2009 EAc3.1: Performance Measurement—Building Automation System
posted by Agata Mozer on Mar 18, 2015, 10:56 am

Is it necessary to calibrate sensors during the performance period even if the manufacturer’s recommended interval didn't pass yet? Or can it only be mentioned in the maintenence plan that the...

Last reply: Melissa Kelly, Dec 10, 2015, 10:18 am

No local zoning requirements

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Agata Mozer on Nov 30, 2015, 9:18 am

Is there an Alternative Complance Path for projects outside the US with no minimum local zoning requirements?

Last reply: Trista Little, Dec 8, 2015, 1:24 pm

Previous coal mine area

NC-2009 SSc5.1: Site development - protect or restore habitat
posted by Agata Mozer on Nov 27, 2015, 9:45 am

Is a site which is located on a teritory of a previous coal mine considered perviously developed? Coal mine works were limited only to underground works, the aboveground site was not affected at...

Last reply: Tristan Roberts, Nov 27, 2015, 11:53 am

Parking spaces for trucks

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Alicja Bieszyńska on Nov 3, 2014, 9:07 am

My project is a distribution center that serves number of loading trucks every day. Obviously, the site plan includes parking spaces for them.
However, the local zoning requirements define...

Last reply: Tristan Roberts, Nov 26, 2015, 11:59 pm

pressure drop adjustemnt in the baseline model

CS-2009 EAp2: Minimum Energy Performance
posted by Agata Mozer on Aug 11, 2015, 7:04 am

I have two questiones:
1. Pressure drop adjustment for heat recovery in the baseline fan power calculations can be taken only if the heat recovery is modeled in the baseline case regardless...

Last reply: Marcus Sheffer, Aug 31, 2015, 9:57 am

G3.1.2.8 Design airflow rates

CS-2009 EAp2: Minimum Energy Performance
posted by Agata Mozer on May 6, 2015, 5:18 am

I have a question regarding section G3.1.2.8 of Appendix G. This section says that "design supply airflow rates for the baseline building design shall be based on a supply-air-to-room-air...

Last reply: Marcus Sheffer, Jun 11, 2015, 9:37 am

Bathtubs

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Agata Mozer on Apr 28, 2015, 8:41 am

Dear All,
Our project is a high-class hotel. We are checking the compliance with WEp1 but we can't find what is the baseline for bathtubs.
Can we assume that tub is the same fixture...

Last reply: Trista Little, Apr 28, 2015, 10:59 am

anticipated annual total ongoing consumables purchases

EBOM-2009 MRc1: Sustainable Purchasing—Ongoing Consumables
posted by Agata Mozer on Apr 1, 2015, 9:15 am

In the Reference Guide on page 254 in Table 1. it's written that "Purchases of of ongoing consumables during the performance period must represent at least 5% (by cost) of documented or...

Last reply: Kimberly Schlaepfer, Apr 1, 2015, 1:19 pm

Eligibility for LEED- existing building structure

LEED Rating System Selection
posted by Agata Mozer on Mar 6, 2015, 4:58 am

forward. It would be benificial to all if you could post the USGBC response on this forum. Good Luck! Log in or register to post comments Melissa Merryweather Director, Green Consult-Asia LEEDuser Premium...

Last reply: Melissa Merryweather, Mar 6, 2015, 9:09 pm

Petrol contamination

NC-2009 SSc3: Brownfield Redevelopment
posted by Alicja Bieszyńska on Jan 27, 2015, 3:06 pm

My project site is located next to one of the main arteries of Warsaw. Due to the high trafic the strip adjacent to the road is contaminated with petrol related substances (not much but still)....

Last reply: Susan Walter, Jan 28, 2015, 4:33 pm