Ozone treatment

NC-v4 EQp1: Minimum indoor air quality performance
posted by Gabriela Crespo on Jul 18, 2016, 5:40 pm

Dear all,

We are working on a project where the ozone levels exceed the most recent three year average, so we must include air-cleaning devices for ozone. Does anybody have any guidance...

Last reply: LEEDme Lorenzi, Jan 11, 2019, 9:04 am

Prerequisites on Design Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Andrés Felipe Sánchez Sánchez on Dec 15, 2018, 6:24 pm

For version 4, Is it possible to send the Design Final Review without documenting one or more prerequisites. In a project there is not enough information to document one prerequisite, but for the...

Last reply: Marcus Sheffer, Dec 17, 2018, 10:34 am

Location of recycling bins

Retail-CI-v4 MRp1: Storage and Collection of Recyclables
posted by Alicia Villanueva on Nov 28, 2018, 12:20 pm

I have a retail project, that is a makeup store, so the space is divided in two main areas, the first one is operation area (staff only) and second one is a store area (sales floor), on the store...

Last reply: Kristina Bach, Nov 28, 2018, 1:00 pm

LPD for covered (open) mechanical room

CS-2009 EAp2: Minimum Energy Performance
posted by Jorge Lopez de Obeso on Nov 21, 2018, 5:22 pm

We're working on an energy modeling configuration and  filling the Section 1.4 Table: The project includes a mechanical room on the roof floor which is not entirely unclosed, it has a steel deck...

Last reply: Marcus Sheffer, Nov 23, 2018, 1:21 pm

LEED CI v4 in a CS V2009

CI-v4 IPc1: Integrative process
posted by Gabriela Mena on Apr 19, 2017, 11:38 am

certification, and then cross-checked that section with the other sections of the guidelines to make sure it was consistent. You can find an example of a submission on the forum page dedicated to CS v3, SS Cr...

Last reply: Summer Minchew, Nov 8, 2018, 9:41 am

Monitoring Plan

Pilot-Credits SSpc55: Bird collision deterrence
posted by Cynthia Fierro on Nov 1, 2018, 7:44 pm

By completing the three-year monitoring plan, what would be the follow-up to the plan?

Last reply: Paula Melton, Nov 6, 2018, 12:00 pm

Thinner use

CS-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by ilse angel on Oct 22, 2018, 9:15 pm

Hi! does the use of thinner for cleaning purposes falls within the scope of this credit?

Do we have to comply with the requirements of the rule 1143?

Thanks!

thinner

CS-v4 EQc2: Low-emitting materials
posted by ilse angel on Oct 18, 2018, 1:00 pm

Hi! does the use of thinner for cleaning purposes falls within the scope of this credit?

Do we have to comply with the requirements of the rule 1143?

Thanks!

thinner use for cleaning purposes

CS-v4 EQc2: Low-emitting materials
posted by monica castro urbina on Oct 11, 2018, 5:18 pm

The construction team want to know if the thinner used to clean the formwork for concrete slabs in the post-tensionnnig method have to comply with the...

Ozone Filtration in C&S V3 Building

NC-v4 EQp1: Minimum indoor air quality performance
posted by Jose Antonio Velazquez Ambrosio on Oct 9, 2018, 5:09 pm

Hello everybody. We have a V4 interior certification design for HVAC in a building that is LEED V3, so the C&S infrastructure do not have a...