Log in
Forum
Loading...
Topic

Lighting group control for On/Off/Mid Lighting control requirement

NC-v4 EQc6: Interior lighting
posted by Thomas Tan on Jul 10, 2019, 12:08 am

Dear LEEDusers,

We have a project with a manufacturing space to pursue the Interior lighting control credit. Dimmers for task lights is not acceptable as safety issue.

To meet the 3...

Last reply: David Hubka, Jul 11, 2019, 11:26 am

Inclusive Design Pilot Credit

Pilot-Credits INpc125: Inclusive Design
posted by Karen Mahrous on Jun 20, 2019, 4:16 pm

Pilot Credit Registration Required Post: Our project chose to pursue this credit because creating a safe, inclusive space for all employees and visitors was very important to the project owners....

Last reply: Emily Purcell, Jul 10, 2019, 6:49 pm

Missing inspection documentation

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by Sean Adams on Apr 2, 2019, 8:36 am

Project has always been trying to earn LEED Silver and...

Last reply: Vanessa Nelson, Jul 10, 2019, 5:21 pm

PV Panles over compliant white membrane with a high SRI

CS-2009 SSc7.2: Heat island effect - roof
posted by Guillermo Hernandez Espinoza on Jul 4, 2019, 6:13 pm

Hi Everyone.

I have an array of pv panels that will be installed over a compliant white membrane with a high...

Last reply: David Posada, Jul 10, 2019, 5:04 pm

Pre development conditions for v4

NC-v4 SSc4: Rainwater management
posted by Gabriela Mesquita on Jul 5, 2019, 11:46 am

Good morning,

In the New Construction v.4 Guide, the calculation of stormwater storage volume for runoff control, does not mention the conditions before the project. I understand that the...

Last reply: David Posada, Jul 10, 2019, 5:00 pm

Exhaust not interlocked with HVAC

NC-2009 EAp2: Minimum Energy Performance
posted by Jorge López de Obeso on Nov 14, 2018, 11:38 am

Hello, we have this residential project were the HVAC system is as follows:

Baseline: System 2 - PTHP

Proposed: Mini Split System

The thing here is that, as known,...

Last reply: deuisi cromversa, Jul 10, 2019, 4:43 pm

Construction Activity pollution prevention inspections

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by Irene Carreno on Aug 17, 2017, 1:27 pm

Hello.
I am working in a project that has the Erosion and control plan following the...

Last reply: Jose Gonzalez, Jul 10, 2019, 4:18 pm

Wet Applied Products Meeting Option 1- Volume Requirement?

NC-v4 EQc2: Low emitting materials
posted by Summer Gorder on Jul 10, 2019, 1:13 pm

For Wet Applied Products that meet IEQ credit 2, option 1: do you still need to provide the volume of the product used on the project, or is that just for option 2, Budget Calculation? Thanks!...

Regional material purchase

NC-2009 MRc5: Regional Materials
posted by Nikita Jayswal on Jul 5, 2019, 9:40 am

Hello,

We have a Project in Germany where the contractor wants to know if the material which if purchased from a local distributor would count towards the credit or would we have to go...

Last reply: Richard Metts, Jul 10, 2019, 10:07 am

Lighting control (occupancy sensor)

CS-2009 EAc1: Optimize Energy Performance
posted by Christophe Boussuge on Jun 28, 2019, 10:23 am

Hi all,

I had review back for my ASHRAE 90.1-2007 model for a LEED project (office building) and would need some advice on how to address the subject.

In the first submission of the...

Last reply: Christophe Boussuge, Jul 10, 2019, 2:51 am