No parking for the project

CI-v4 LTc5: Reduced parking footprint
posted by Ricardo Sá on Jan 9, 2017, 7:30 am

I understand that LEED v4 CI specifically states that "if there is existing parking associated with the project, it must comply with the requirements of the credit and show a percentage reduction...

Last reply: emily reese moody, May 14, 2019, 12:51 am

LEED turf

NC-v4 SSc3: Open space
posted by chloe lamontagne-girard on Jan 8, 2018, 11:28 am

Does LEED turf count as vegetation in the 25 % minimum vegetation of outdoor space?

Last reply: Chelsea M, May 13, 2019, 5:25 pm

Confidential client

CI-v4.1 MRc1: Long-term commitment
posted by Carina Clark on May 13, 2019, 3:40 pm

How has a team met this credit if the client is confidential?

Meeting Option 2 Requirements

CI-v4 EAc3: Advanced Energy Metering
posted by Bonny Gray on May 11, 2019, 5:28 pm

Below are the construction review comments from our reviewer:

Option 2:  Advanced Metering

  1. It is unclear if the Table:  Advanced Meters includes all individual energy end-uses...

Last reply: Bonny Gray, May 13, 2019, 11:50 am

Water Restoration Certificates- Europe

Pilot-Credits WEpc110: Water Restoration Certificates®
posted by Ricardo Sá on Feb 12, 2019, 10:57 am

Hi,

does anyone know of any company in Europe providing Water Restoration Certificates (or any local equivalent)?

Regards,

Last reply: Karen Elliott, May 13, 2019, 10:19 am

Bike numbers for Resort

NC-v4 LTc6: Bicycle facilities
posted by Neshat Sakeena on May 12, 2019, 1:39 am

I am working on a resort project located at a remote location. The resort has a bicycle track that connects to single room chalets that will have an...

Energy Model AND LEED Excel sheet required

NC-v4 EAc2: Optimize Energy Performance
posted by Brandon White on May 10, 2019, 9:57 am

Are both required to be completed?  If so, one has to enter all the building information into compliant energy modeling software AND into the LEED Excel sheet?  That's ridiculous. 

Last reply: Sarah Gudeman, May 11, 2019, 12:47 am

EVSE- ISO 15118 compliance

NC-v4.1 LTc8: Electric Vehicles
posted by Mike Cavanaugh on May 9, 2019, 6:30 pm

I'm looking into substituting this credit and pursuing option 1 (2% of spaces) but have a question about the third criteria for EVSE - Vehicle to Grid (ISO 15118) compliance.  I've researched and...

Last reply: Mike Cavanaugh, May 10, 2019, 5:36 pm

Baseline System Selection in LEED v4

NC-v4 EAp2: Minimum Energy Performance
posted by Samer Hassanie on May 8, 2019, 6:26 am

This is in regards to Eap2 Minimum Energy Performance and Eac1 Optimized Energy Performance.

We need help with choosing the baseline system for a v4 BD+C residential project in Sweden (...

Last reply: Samer Hassanie, May 10, 2019, 3:25 pm

Core & Shell Data Center (saving from IT load in tenant spaces)

CS-v4 EAp2: Minimum Energy Performance
posted by Yoyo Shek on May 6, 2019, 4:04 am

Hi All,

We are having a data center project that all data halls will be rented out (i.e. All IT equipment will be supplied by the tenant after the building completion, however the HVAC...

Last reply: Marcus Sheffer, May 10, 2019, 3:07 pm