Log in
Forum
Loading...
Topic

Site Boundary & Lighting Boundary

NC-2009 SSc8: Light Pollution Reduction
posted by Caroline O'Leary on Oct 2, 2015, 7:58 pm

I've been reading and re-reading the interpretations by USGBC and the posts on this site and I still feel like I can't positively state the answer to the following question our team has:
...

Last reply: MANNY IGLESIA, Apr 10, 2019, 6:28 pm

Solar Panels

CI-v4 EAc1: Enhanced Commissioning
posted by Alexis Voeltner on Apr 8, 2019, 5:05 pm

Do solar panels that are being installed by the building owner need to be commissioned before the LEED submittal or can the...

Last reply: Alexis Voeltner, Apr 10, 2019, 5:29 pm

Fresh air for toilet vestibule according to ASHRAE 62.1-2010 LEEDv4

CS-v4 EAp2: Minimum Energy Performance
posted by Przemysław Rejczak on Apr 8, 2019, 7:17 am

Dear Everyone

I am writing regarding to fresh air requirements for Baseline Case. According to new ASHRAE 90.1-2010 requirement it should be modeled according to rating authority or...

Last reply: Marcus Sheffer, Apr 10, 2019, 3:37 pm

Fresh air for toilet vestibule according to ASHRAE 62.1-2010

CS-2009 EAp2: Minimum Energy Performance
posted by Przemysław Rejczak on Apr 8, 2019, 7:10 am

Dear Everyone

I am writing regarding to fresh air requirements for Baseline Case. According to new ASHRAE 90.1-2010 requirement it should be modeled according to rating authority or...

Last reply: Marcus Sheffer, Apr 10, 2019, 3:36 pm

Can a single room have 3 View Types because of different window views?

NC-v4 EQc8: Quality Views
posted by Danielle Waters on Apr 10, 2019, 3:34 pm

The project is a fort dormitory where each suite has three windows -- one to the outdoors, second facing another window / outdoors, and third facing into a courtyard/lightwell. The first window...

PI Form 1, Must Use a Reasonable Site Boundary

NC-2009 PIf1: Minimum Program Requirements
posted by Vincent Pieri on Apr 10, 2019, 2:55 pm

Our project is registered as a single LEED NC 2009 building located on a previously developed site abutting an existing LEED certified and non LEED certified building site at the North boundary...

Soil restoration and testing

NC-v4 SSc2: Site development - protect or restore habitat
posted by Lyle Axelarris on Jun 27, 2016, 8:07 pm

I'd like to hear from project teams who have successfully pursued this credit. Is the soil testing actually required or is it a means to an end? The reference guide uses the word "can" a lot...

Last reply: Martha Norbeck, Apr 10, 2019, 2:32 pm

Rainwater Harvesting / Domestic Hot Water

NC-v4.1 WEc4: Water metering
posted by Michael Kelly on Apr 10, 2019, 2:29 pm

1) Does...

Products with a critically reviewed LCA

NC-v4.1 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Maggie Wildnauer on Apr 10, 2019, 1:30 pm

From reading the wording on the first option, for a critically reviewed LCA, it doesn't appear that a company needs to be explicitly recognized as a participant in the LCA - is this true? For...

Lighting Power Modeling for Core and Shell Building

CS-v4 EAp2: Minimum Energy Performance
posted by Saif A on Apr 10, 2019, 10:50 am

Hi,

I am trying to model the lighting power for a core and shell office building, the lighting is designed for the core spaces such as main lobby, restrooms and BOH, but the tenant spaces...

Last reply: Saif A, Apr 10, 2019, 1:14 pm