Drawings can be separately prepared and submitted?

CS-2009 SSc7.2: Heat island effect - roof
posted by Yuko Murata on Jun 17, 2020, 10:24 pm

Yuko Murata Architect, LEED AP BD+C Nikken Sekkei LEEDuser Premium Member 1 thumbs up June 18, 2020- 9:55 pm It would be very much appreciated if I can lend your expertise.  Log in or register to post comments Summer Minchew Managing Partner Ecoimpact Consulting LEEDuser Expert 89 thumbs up June 19, 2020- 7:54 am Is your project registered under LEED v2009 or LEED v4? With your comment being here on the LEED v2009 CS forum for Heat Island Effect- Roof, you should only be looking at roofing materials for this credit. If you are referencing LEED v2009 CS Heat Island Effect- Nonroof credit, you should only...

Last reply: Yuko Murata, Jun 19, 2020, 7:32 pm

Option 3. Carshare- Occupant Classification

NC-v4.1 LTc7: Reduced parking footprint
posted by Maddie Spinski on Jun 2, 2020, 10:05 am

"Provide at least one vehicle parking space for every 100 occupants, rounded up. If the project has fewer than 100 occupants, provide one carshare vehicle parking space."

Are...

Last reply: Kelli Kimura, Jun 19, 2020, 3:21 pm

Healthcare V4- Monitoring outdoor air intake IAQ prerequisite

Healthcare-v4 EQp1: Minimum indoor air quality performance
posted by Alessandro Zuanon on Jun 19, 2020, 4:01 am

Hi,

Healthcare rating system, monitoring requirements for prerequisite...

Outdoor Water Use Reduction- Establishment Period

NC-v4 WEc1: Outdoor water use reduction
posted by David Valade on Jun 18, 2020, 5:53 pm

For Outdoor Water Use Reduction - when targeting 'Option 2: Reduce Irrigation', does LEED v4 or 4.1 allow for an establishment period with potable water or can potable water not be used at all? I...

Floor classification

NC-v4.1 EAp2: Minimum Energy Performance
posted by Davide Liviero on Jun 17, 2020, 3:52 am

Hello everyone,

I am a beginner modeler and i need you help on the classification of the floors within the office building I am modeling. In this building I have three types of floor I...

Last reply: Davide Liviero, Jun 19, 2020, 10:35 am

Requerimiento horario

Retail-NC-v4 SSc6: Light Pollution Reduction
posted by Jorge Adalberto Bernal Segovia on Jun 18, 2020, 4:57 pm

Existe algún requerimiento horario para el apagado y encendido de luces exteriores?

Es decir si solo a inicios de la noche la iluminación exterior esta encendida, y luego la misma se apaga...

Last reply: Jorge Adalberto Bernal Segovia, Jun 19, 2020, 9:53 am

AEDG Calculator Needed When Base Building Systems Weren't Modified or Contributing to Savings?

CI-v4 EAc2: Optimize Energy Performance
posted by Gera Feigon on Jun 18, 2020, 10:47 pm

I have a small office fit-out project that is pursuing Option 2 (prescriptive) for Optimize Energy Performance. The...

Last reply: Marcus Sheffer, Jun 19, 2020, 9:38 am

Play area excluded from calculations?

NC-v4.1 SSc4: Rainwater management
posted by Maddie Spinski on Jun 19, 2020, 9:26 am

We are building an early childhood education center next to the existing elementary school. Can we exclude the play area and existing parking lot that we are only adding one space to? We aren’t...

C&S or NC: New Building with leased Office Space but occupied 80-90% by one tenant at completion

LEED Rating System Selection
posted by Jessica Kavanagh on Jun 18, 2020, 12:36 pm

Core & Shell vs New Construction:

In a situation where a new building is being constructed by a developer/landlord and the incoming tenant will be signing a lease with that entity, is...

Tenants using energy supplier meters

CS-v4 EAc3: Advanced Energy Metering
posted by Ricardo Sá on Jun 18, 2020, 4:07 am

Dear All,

We are currently certifying a large office building using LEED v4 BD+C Core & Shell.

The...

Last reply: Marcus Sheffer, Jun 18, 2020, 12:15 pm