Log in
Forum
Loading...
Topic

When is a CAPP Plan not a LEED conforming Plan?

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by Harry Flamm on Sep 17, 2019, 7:17 pm

We are building a high-rise residential building in a tight urban (Boston) site that is under 1-acre in size.

Since it is less than 1-acre, the...

Last reply: Harry Flamm, Oct 1, 2019, 9:44 am

47 Serving sizes

WELL v1 Building Standard Tipsheet
posted by Carina Clark on Jul 31, 2017, 8:29 am

Clarification needed for 47 Serving sizes:
On Part 2: Dishware
d. Cups are no larger than 473 mL [16 oz].

Does this include both coffee/tea mugs as well as water glasses?

Last reply: Clare Epke, Sep 30, 2019, 5:28 pm

LEED v4 Interior Lighting Quality Option 2, Strategy A

NC-v4 EQc6: Interior lighting
posted by Kera Lagios on Jul 15, 2016, 6:27 pm

that meets this criteria. If anyone does find one, let the forum know! The best way around this is to use direct/indirect lighting or indirect only lighting. It's a little unclear in the LEED Guide,...

Last reply: John Beeson, Sep 30, 2019, 5:10 pm

v4 Compliant Stadium/Athletic Field Lighting

NC-v4 SSc6: Light Pollution Reduction
posted by Peter Doo on Sep 27, 2019, 3:02 pm

Does anyone know of a manufacturer for v4 compliant athletic field lighting. I have a school that needs to provide a few precedent options for specification and have only confirmed that Musco...

Last reply: Bill Swanson, Sep 30, 2019, 4:06 pm

v4

Schools-NC-v4 SSc6: Light Pollution Reduction
posted by Peter Doo on Apr 22, 2016, 3:43 pm

The v4...

Last reply: Bill Swanson, Sep 30, 2019, 3:20 pm

Dmestic Hot Water heating "capacity"?

NC-v4 WEc4: Water metering
posted by Karen Joslin on Sep 10, 2018, 1:02 pm

I'm surrounded by really smart mech engineers and we need clarification about how to measure the total combined heating capacity. We use tanks plus on demand (larger capacity...

Last reply: Karen Joslin, Sep 30, 2019, 11:36 am

Enhanced IAQ Strategies, applicable Entries Querie.

CI-v4 EQc1: Enhanced indoor air quality strategies
posted by Angel Giovani Bernal on Sep 19, 2019, 1:58 pm

Hi everybody.

I'm working on a commercial interiors project located on the 9th, 12th, 14th & 15th floor.

I'm trying to identify the regularly used exterior entrances to the...

Last reply: Mohammad H Abbasi, Sep 30, 2019, 10:55 am

Operable Partitions

NC-v4 EQc2: Low emitting materials
posted by Jeff Ross-Bain, PE, LEED Fellow on Sep 30, 2019, 10:14 am

We have a project that is struggling to find LEEDv4 compliant operable partitions. Could anyone recommend a manufacturer that has CDPHv1.1-2010 general emissions testing (i.e., GREENGUARD Gold,...

If bare raised floor is covered with carpet- is it reused?

CI-v4 MRc2: Interiors life-cycle impact reduction
posted by Diana Nezamutinova on Aug 26, 2016, 9:34 am

1. In our fit-out project in London the...

Last reply: Eva Chen, Sep 30, 2019, 12:28 am

Mid-Rise-v4 MRp1- Certified tropical wood-- if 100% is NOT AVAILABLE, what is solution

Mid-Rise-v4 MRp1: Certified tropical wood
posted by Howard Block on Sep 26, 2019, 3:57 pm

We are a  65 year old  FSC  Certified large lumber yard near Washington DC.  We have a project  certifying :   LEED v4 Homes and Multifamily Midrise . We have a large  requirement   of IPE ...