BOD review from the BECx consultant

NC-v4 EAc1: Enhanced Commissioning
posted by Julie Trottier on Jun 4, 2019, 11:44 am

Good Morning,

In order to pursue the EAc1 option 2 , we are the building envelope...

Last reply: Scott Bowman, Aug 11, 2019, 6:01 pm

"durability"

NC-v4 EAp1: Fundamental commissioning and verification
posted by Tom Kennedy on Jun 5, 2019, 6:39 pm

The Pre-req...

Last reply: Scott Bowman, Aug 11, 2019, 5:56 pm

Enhanced Commissioning

NC-v4 EAp1: Fundamental commissioning and verification
posted by saif eddine majdaoui on Jun 25, 2019, 2:26 am

We are working on a big project, we are the LEED subcontractor (consultant) of the general contractor (All trades), 
The owner gave all LEED responsibilities to the general contractor, so...

Last reply: Scott Bowman, Aug 11, 2019, 5:49 pm

Commissioning of Existing Equipment

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Jatuwat Varodompun on Jul 22, 2019, 1:24 am

We have a major renovation project which is 40% of gross area. Do we need to...

Last reply: Scott Bowman, Aug 11, 2019, 5:37 pm

CS EA credit Enhanced Cx- who can serve as CxA

CS-v4 EAc1: Enhanced Commissioning
posted by Deeta Bernstein on Jul 22, 2019, 2:08 pm

Any precedent in pursuing the Enhanced...

Last reply: Scott Bowman, Aug 11, 2019, 5:30 pm

EAp1-Fundamental Commissioning and Verification- OPR / BOD

NC-v4 EAp1: Fundamental commissioning and verification
posted by Maria Peralta on Jul 26, 2019, 3:38 am

Hello, I have a question regarding the...

Last reply: Scott Bowman, Aug 11, 2019, 5:26 pm

LEED v4 CI EAb Opt. Energy Perf.: Option 2: AEDG Maximum Project Size requirements

CI-v4 EAc2: Optimize Energy Performance
posted by Kristen Callori on Aug 9, 2019, 3:03 pm

Our project is an existing 300,000 sf Office building. Our client is both the new owner and will be the sole tenant. No changes will be made to the Mechanical other than the distribution (New...

Last reply: Marcus Sheffer, Aug 9, 2019, 4:53 pm

CDPH v1.2 vs. 1.1 and Exposure Scenarios for Compliance

CI-v4 EQc2: Low emitting materials
posted by Patricia Lloyd on Aug 9, 2019, 3:42 pm

I received LEED review comments for a commercial office space that the said "adhesive product Greenguard Gold certificate indicates the Classroom Exposure Scenario was used to determine ...

"Meeting but not Exceeding Local Zoning requirements" and Building Type based on local zoning

CS-2009 SSc4.4: Alternative transportation - parking capacity
posted by Edgar Arevalo on Aug 9, 2019, 2:36 pm

1) I have been carefully looking over the description for achieving this credit under Case, Option 1, and what I find confusing is how it says in the handbook, "Size parking capacity must meet...

SSc4 Surveying Staff Throughout Building

EBOM-2009 SSc4: Alternative Commuting Transportation
posted by Alexis Doyle on Aug 9, 2019, 12:55 pm

Hello,