Documentation for no once-through cooling?

NC-v4 WEp2: Indoor water use reduction
posted by Jasmine A on Aug 6, 2019, 4:22 pm

I have a question relating to the heat rejection & cooling requirement of "No ...

Last reply: Jasmine A, Aug 7, 2019, 10:59 am

LVR wood stain and concrete sealer

CI-v4 EQc6: Interior lighting
posted by Sue Bryant on Aug 7, 2019, 10:46 am

How do you find the LVR for these products? 

Gray water for irrigation

LEED v4.1 Discussion Forum
posted by Hoda Ibrahim on Aug 6, 2019, 11:53 am

Our project have external gray water for irrigation so we don’t have to treat water on site 

Can I consider option 2 for 100% reduction or not? 

And what about calculations...

monitoring frequency of Storm Water Prevention Plan

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by saif eddine majdaoui on Jul 2, 2019, 11:05 am

Does the monitoring of SWPP and PCES have to be carried out every week on LEED certification projects even if in the absence of rainy / weather events (No precipitation / no rain

Last reply: Nischay Gowda, Aug 7, 2019, 8:53 am

Recycling treated lumber or plywood?

NC-v4 MRp2: Construction and demolition waste management planning
posted by Renee Shirey on Jul 15, 2019, 5:19 pm

Has anybody found a way to recycle/divert plywood or other engineered...

Last reply: Nischay Gowda, Aug 7, 2019, 8:12 am

Waste Management Coordinator

NC-v4 MRp2: Construction and demolition waste management planning
posted by Akshay Padwal on Mar 5, 2019, 4:50 pm

The person (program manager) who is coordinating waste management, do they have to be LEED certified? 

Last reply: Nischay Gowda, Aug 7, 2019, 8:05 am

Location and Transportation- option 2: Diverse uses

LEED v4.1 Discussion Forum
posted by Ricardo Filho on Aug 7, 2019, 7:11 am

Hi all;

I have a question on the Location and Transportation credit, more specifically on the topic of the Diverse use:

the User guide says:

"No more than two uses in...

Requirements for "Ongoing Feedback Mechanism"?

CI-v4 IPc1: Integrative process
posted by Renee Shirey on Aug 6, 2019, 7:23 pm

The requirement of "Briefly describe the planned method for gathering feedback on occupant satisfaction. Include information on sample sizes,

timing, and format." sounds an awful lot like...

IEQc4.1 Required information

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Victoria Rios Esteve on Jul 24, 2019, 2:37 pm

Hi everyone! 

I´m pretty new at LEED certification process, so I will really appreciate your help. 

We are close to upload the construction submittal on a project we have been...

Last reply: Tricia Loe, Aug 6, 2019, 4:36 pm

1 EV charging station for 2 spaces and Vehicle Fueling Capacity per Station

CS-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Edgar Arevalo on Aug 2, 2019, 2:01 pm

I was informed that the LEED project in question has 1 charging station and two reserved parking spots.  Am I to assume that this station has two charging cables, one for each spot, or should I...