Log in
Forum
Topic

LEED v5 BD+C/ID+C Project Priorities and Innovation public comments

LEED v5 BD+C/ID+C: Project Priorities and Innovation Public Comments
posted by Nadav Malin on Apr 3, 2024, 6:27 am

Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C Project Priorities and Innovation category on this forum. You can reply to this thread or use the "Post a Question...

LEED v5 BD+C/ID+C Water Efficiency public comments

LEED v5 BD+C/ID+C: Water Efficiency Public Comments
posted by Nadav Malin on Apr 3, 2024, 6:24 am

Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C Water Efficiency category on this forum. You can reply to this thread or use the "Post a Question or Comment" button...

Social Equity Within The Supply Chain

Pilot-Credits IPpc144: Social equity within the supply chain
posted by Atlas Turner on Feb 28, 2023, 3:53 pm

The updated Social Equity within the Supply Chain appears to be more achievable.

The original required permanently installed products from 10 different manufacturers meeting options 1 or...

Last reply: Zhantong Chen, Apr 3, 2024, 5:41 am

IAQ Photos

NC-v4 EQc3: Construction indoor air quality management plan
posted by Dave Hubka on Nov 30, 2021, 11:08 am

there are quite a few...

Last reply: Afogreen Build, Apr 3, 2024, 5:15 am

If a parcel crosses the 1/4 mile radius, does it count?

CS-v4 LTc4: Surrounding density and diverse uses
posted by Armond Dai on May 19, 2023, 5:04 pm

Emily Purcell Sustainable Design Lead CannonDesign LEEDuser Expert 310 thumbs up May 22, 2023- 11:22 am Hi Armond, you can include or exclude at your discretion. Just be consistent with whichever you decide to do.  Log in or register to post comments Afogreen Build www.afogreenbuild.com Green Building Consultant LEEDuser Premium Member 200 thumbs up April 3, 2024- 5:14 am Hi Armond, Please kindly refer to link below for reviewer comment based on this situation: https://leeduser.buildinggreen.com/forum/14-mile-radious-building-boundary Where building intersect the 1/4-mile offset,...

Last reply: Afogreen Build, Apr 3, 2024, 5:14 am

Residential clothes washers

CS-v4 WEp2: Indoor water use reduction
posted by Vanessa Montezuma Ramos on Mar 28, 2024, 12:12 am

Hi everyone, 

We are currently trying to certify a residential project and during the final preliminary review, it was noted that we have a laundry room with spaces for clothes washers. Is...

Last reply: Vanessa Montezuma Ramos, Apr 3, 2024, 12:57 am

Certification of a high-voltage electrical substation

LEED v4.1 Discussion Forum
posted by LEED User95 on Apr 2, 2024, 12:16 pm

Hello,

Is the construction of a high-voltage electrical substation certifiable ?

If so, under which category of building would it be classified in the reference framework ?

...

Last reply: Nadav Malin, Apr 2, 2024, 4:46 pm

Heads Up! Reviewers may not round up from 9.99%

NC-2009 MRc5: Regional Materials
posted by Lyle Axelarris on Sep 21, 2020, 12:04 pm

I just received a review that did not award MRc5, because the Regional Material cost added up to 9.99%, not "the minimum of 10% required for one point." 

I can understand not granting 9.5...

Last reply: Allison Para, Apr 2, 2024, 3:34 pm

Site with no existing greenfield

CS-v4 SSc2: Site development - protect or restore habitat
posted by Agustin Bertolotti on Mar 9, 2023, 9:01 am

Hi everyone

We are working on a site which is previously developed with no existing...

Last reply: Afogreen Build, Apr 1, 2024, 9:08 pm

How can the MRp2 Plan be accredited in an existing building that you want to certify?

CS-v4 MRp2: Construction and demolition waste management planning
posted by Carlos Bueno on Feb 6, 2023, 12:54 pm

A potential existing building (with two years to go) now wants to be LEED certified. The client has provided us with all the information on the design and construction of the building, but we...

Last reply: Afogreen Build, Apr 1, 2024, 9:05 pm