Log in
Forum
Loading...
Topic

LEED v4 CI EAb Opt. Energy Perf.: Option 2: AEDG Maximum Project Size requirements

CI-v4 EAc2: Optimize Energy Performance
posted by Kristen Callori on Aug 9, 2019, 3:03 pm

Our project is an existing 300,000 sf Office building. Our client is both the new owner and will be the sole tenant. No changes will be made to the Mechanical other than the distribution (New...

Last reply: Marcus Sheffer, Aug 9, 2019, 4:53 pm

CDPH v1.2 vs. 1.1 and Exposure Scenarios for Compliance

CI-v4 EQc2: Low emitting materials
posted by Patricia Lloyd on Aug 9, 2019, 3:42 pm

I received LEED review comments for a commercial office space that the said "adhesive product Greenguard Gold certificate indicates the Classroom Exposure Scenario was used to determine ...

"Meeting but not Exceeding Local Zoning requirements" and Building Type based on local zoning

CS-2009 SSc4.4: Alternative transportation - parking capacity
posted by Edgar Arevalo on Aug 9, 2019, 2:36 pm

1) I have been carefully looking over the description for achieving this credit under Case, Option 1, and what I find confusing is how it says in the handbook, "Size parking capacity must meet...

SSc4 Surveying Staff Throughout Building

EBOM-2009 SSc4: Alternative Commuting Transportation
posted by Alexis Doyle on Aug 9, 2019, 12:55 pm

Hello,

We are looking to complete an alternative commuting survey at a building owner and the property owner has suggested that we tour the building, visiting each office and survey people...

Calculating Residential Density- comparing to what acreage?

NC-v4 LTc4: Surrounding density and diverse uses
posted by Renee Shirey on Aug 8, 2019, 1:36 pm

In calculating the DU/acre, what land is used to determine the overall acreage? Am I comparing the # of residential units compared to the total acreage in the 1/4 radius, that total acreage minus...

Last reply: Emily Purcell, Aug 9, 2019, 11:19 am

minor improvements within the water body body buffers: grade changes necessary to ensure public access

NC-v4 LTc2: Sensitive land protection
posted by Louise Schlatter on Aug 6, 2019, 6:14 pm

Hi.  I have a question about minor improvements within the...

Last reply: Blake Jackson, Aug 9, 2019, 10:15 am

FSC wood

NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by Hoda Ibrahim on Aug 9, 2019, 3:12 am

Can I use imported...

Last reply: Nadav Malin, Aug 9, 2019, 9:43 am

Submetering Process Water- Assisted Living laundry

NC-v4 WEc4: Water metering
posted by Jennifer Rennick on Jul 18, 2019, 1:12 am

I'm working on an assisted living facility that will have laundry machines in just a few of their residential units, but generally have a central laundry facility for the building. Would the...

Last reply: Erkki Seinre, Aug 9, 2019, 5:12 am

Option 1- Flushout of Non-Occupied Spaces

NC-v4 EQc4: Indoor air quality assessment
posted by Mike Bahr on Aug 8, 2019, 6:41 pm

My project is a mid-rise building with the lower 5 levels being open air parking. Is that required to be flushed, and meet humidity and temperature requirements?

Charging station capacity- Option 2 Electric vehicles

CS-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Frantisek Macholda on Mar 21, 2018, 6:11 am

Dear all,

developer decided to meet the requirement via option 2- installing electric charging station at our project. The requirement of 3% of total parking capacity equipped with...

Last reply: Edgar Arevalo, Aug 8, 2019, 4:04 pm