Topic | Recent |
---|---|
Any way to download LEED project data?LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Sustainability Ballinger on Mar 13, 2024, 5:29 pm
I'm working on creating a database of our firm's project data, specifically around our sustainability efforts. I don't currently see any way on the LEED Online website to download in a data-... |
|
TRUE Waste Certification Advisor RecommendationEBOM-v4.1 MRp3: Waste Performanceposted by Daniel Bertschinger on Mar 13, 2024, 3:32 pm
Hello Everyone! |
|
Mixed-use buildingNC-v4 LTc8: Green vehiclesposted by CT G on Mar 13, 2024, 2:02 pm
We are working on a project with three towers (30 floors above grade) with a common base (ground floor and the first two floors are shared by the three towers). Two towers are multi-family... Last reply: Emily Purcell, Mar 14, 2024, 3:35 pm |
|
Pilot credit RequirementPilot-Credits SSpc55: Bird collision deterrenceposted by on Mar 12, 2024, 1:05 pm
Commenting to comply with credit requirements. Credit language is clear and the team was able to implement without trouble. The project used a highly reflective glazing to comply. |
|
Lighting Control in blood draw spacesHealthcare-v4 EQc6: Interior lightingposted by Heather Belsey on Mar 11, 2024, 3:56 pm
For the lighting credit you need to have individual controls at 90% of patient positions. LEED defines patient positions as: A patient bed, infusion chair, recovery... |
|
Green wallsNC-v4 SSc3: Open spaceposted by Santiago Avila on Mar 11, 2024, 10:44 am
Hello everybody, I would like to confirm if green walls counts as green area for open spaces, clarly without any artificial/fake plants. |
|
EPD of aluminium systemsNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Mary Brown on Mar 11, 2024, 4:34 am
Hello everybody, I have a question regarding the necessity for EPD concerning aluminium profile or aluminium system to a LEED project. Regading aluminium systems (eg aluminium window),... Last reply: Michelle Bombeck, Mar 12, 2024, 11:43 am |
|
Commissioning near end of constructionNC-v4 EAp1: Fundamental commissioning and verificationposted by Nadia Azzam on Mar 7, 2024, 10:37 am
We have been handed over a project aiming for LEED Gold that was delayed due to COVID and previously managed by a different LEED admin who has since left the company. After reviewing the... Last reply: Dave Hubka, Mar 8, 2024, 9:33 am |
|
Commercial Kitchen QueryCI-v4 EAp2: Minimum Energy Performanceposted by padma priya on Mar 7, 2024, 6:30 am
In LEED ID+C: v4 : Commericial Interior project have commercial kitchen space (Veg & Non veg), then which are the credit has been impact. Last reply: Marcus Sheffer, Mar 25, 2024, 9:48 am |
|
Enhanced Refrigerant Management QueryEBOM-v4 EAc8: Enhanced Refrigerant Managementposted by padma priya on Mar 7, 2024, 4:16 am
We have a VAM Chiller, and we indicated "none" as the refrigerant type because in VAM chillers, water serves as the refrigerant, resulting in zero OWP and... Last reply: Dave Hubka, Mar 9, 2024, 11:42 pm |