Option 2: Prescriptive Method Skylight Inclusion

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Annalise Reichert on Feb 26, 2014, 4:15 pm

I am working on a project using the prescriptive daylighting method for achieving IEQc8.1 The project has both sidelighting and toplighting. If the skylights are excluded, the project's regularly...

Last reply: Jill Dalglish, PE, Feb 26, 2014, 7:23 pm

equipment

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Oleg Petryuchenko on Sep 30, 2013, 10:13 am

if we have manufacturing equipment on the floor and all area is daylit through skylights, providing even lighting level across the space do we need to exclude sq. footage of equipment from...

Last reply: Oleg Petryuchenko, Feb 19, 2014, 3:30 pm

Daylight and Views- Simulation Documentation

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Candice Rogers on Nov 14, 2013, 4:29 pm

Hello -

This is my first time using the Simulation option for documenting Daylighting. For the Supplemental Daylight and Views Calculation Worksheet, do we represent our 5 ft. grid in...

Last reply: Jill Dalglish, PE, Nov 14, 2013, 5:39 pm

What controls are required so autoshades can comply with credit?

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Abena Darden on Oct 18, 2013, 6:43 pm

We note that the prescriptive method for IEQc8.1 allows view preserving automated shades to be used as a glare control device, and that in the sidelighting section of theTable IEQ-1 spreadsheet,...

Last reply: TODD REED, Oct 21, 2013, 8:33 am

Daylight measurement requirements...

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Rick Alfandre on Oct 4, 2013, 5:21 pm

I am not finding any parameters for the daylight measurement option as far as times of day or other issues.

The project is a bank branch, and I imagine we will need to have electric...

Last reply: TODD REED, Oct 7, 2013, 8:24 am

LEED Matrix

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Oleg Petryuchenko on Sep 30, 2013, 10:09 am

we have some spaces that excluded from 8.1 according to matrix such as lobby, brake room.. but they are properly daylit (10-500fc) based on AGI calcs. will it be correct to add these areas to...

Last reply: Oleg Petryuchenko, Sep 30, 2013, 5:31 pm

Gallery space and daylight

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Jatuwat Varodompun on Sep 28, 2013, 10:03 am

In space matrix april 2013, the gallery must be have daylight and view acess. If my project has such space but the objects and displays are inappropriate for daylight. It might be damaged. Can I...

Last reply: TODD REED, Sep 30, 2013, 8:57 am

Floor Area for Daylight

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Mark Garber on Sep 17, 2013, 3:01 pm

Can the floor area under built-in casework composed of base cabinets and overhead cabinets be excluded from the floor area using the prescriptive option for sidelighting daylight calaculations...

Last reply: TODD REED, Sep 30, 2013, 8:50 am

green house and daylighti credit

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Oleg Petryuchenko on Aug 21, 2013, 2:02 pm

We have large warehouse project that also has a green house as a part of the building. could this area be excluded from daylighting? it's a regularly occupied space but the production process...

Last reply: Jill Dalglish, PE, Aug 23, 2013, 6:14 pm

Room by room versus Apartment calculations

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Michael Wironen on Aug 15, 2013, 11:12 am

Our project is a 14-floor residential project. We are pursuing the prescriptive pathway for daylighting, which requires us to calculate the floor to window ratios for each room. However, we...

Last reply: TODD REED, Aug 15, 2013, 11:28 am