Log in
Forum » NC-2009 IEQp1
Loading...
Topic

A single big space which include several functions.

NC-2009 IEQp1: Minimum IAQ Performance
posted by FABIO VIERO on Oct 5, 2015, 12:37 pm

Hi All,

I'm now working on a project under LEED NC certification.
The ground floor includes a conference room, offices, technical spaces, meeting rooms, and one big space, in which...

Last reply: Andrew Mitchell, P.E., Nov 2, 2015, 8:54 am

Alternative Compliance in lieu of LEED Tables

NC-2009 IEQp1: Minimum IAQ Performance
posted by kevin connolly on Oct 28, 2015, 1:20 pm

Has anyone been successful using the alternative compliance path and submitting their own ASHRAE 62.1 calculation/spreadsheets in lieu of using the built in LEED or 62MZCalc form?

We would...

Last reply: Andrew Mitchell, P.E., Nov 2, 2015, 8:21 am

Exhaust Requirement

NC-2009 IEQp1: Minimum IAQ Performance
posted by SAMY Chamy on Nov 2, 2015, 2:18 am

I think this credit is for fresh air requirement.

Is there any requirement for Exhaust rates, are they need to documented for this credit

Our project have store rooms as per local...

Last reply: Andrew Mitchell, P.E., Nov 2, 2015, 8:15 am

v2009v4_Minimum IAQ Performance Calculator_v02- Any Experience?

NC-2009 IEQp1: Minimum IAQ Performance
posted by O Moltay on Oct 19, 2015, 7:39 am

Dear Members,

Do you any experience with the v2009v4_Minimum...

Last reply: Jian Hui Liu, Oct 28, 2015, 4:26 am

source of air for mechanical Ventilation

NC-2009 IEQp1: Minimum IAQ Performance
posted by Alan Viale on Oct 27, 2015, 8:11 pm

We have a project that is natural ventilated in perimeter spaces (circulations and cafe dining rooms), and It is mechanical ventilated in core spaces (meeting rooms and cafe dining room) that is...

Last reply: Andrew Mitchell, P.E., Oct 27, 2015, 8:29 pm

Engineered natural ventilation system

NC-2009 IEQp1: Minimum IAQ Performance
posted by Jutta Berns on Oct 9, 2015, 5:42 am

Hi all

We have three Warehouse's that use 'turbo ventilators' (wind driven extraction fans) and not a pure mechanical system. The warehouses also do not have enough enough openings to meet...

Last reply: Jutta Berns, Oct 27, 2015, 4:57 am

Working with IEQ P1.

NC-2009 IEQp1: Minimum IAQ Performance
posted by VEL MUTHU on Sep 16, 2015, 6:30 am

Hello everyone,

I am currently working on a project which has a design requirement on air side system and water side system. When I tried to enter the details into the LEED online form, I...

Last reply: Gustavo De las Heras Izquierdo, Sep 29, 2015, 2:12 pm

System type

NC-2009 IEQp1: Minimum IAQ Performance
posted by Emmanuel Pauwels on Sep 15, 2015, 11:18 am

If a space is ventilated through an exhaust fan (rate according VRP) and a permanently open vent to the outdoors, can this space be considered mechanically ventilated, 100%OA and can use an Ez of...

Last reply: Gustavo De las Heras Izquierdo, Sep 16, 2015, 11:11 am

Kitchen MUA Unit

NC-2009 IEQp1: Minimum IAQ Performance
posted by Laura Charlier on Jul 10, 2015, 11:22 am

I'm wondering if the kitchen MUA unit needs to included in the ventilation calculations? We would like to exclude it from our calcs because it’s primary purpose is for space pressure control, not...

Last reply: MURAT DOĞRU, Sep 16, 2015, 6:24 am

Ventilation for parking garage

NC-2009 IEQp1: Minimum IAQ Performance
posted by FABIO VIERO on Aug 21, 2015, 4:29 am

Hi All,

I have a question about a project under LEED certification.

We are designing the ventilation of one floor below-grade parking garage, situated below an open area adjacent to...

Last reply: FABIO VIERO, Aug 31, 2015, 10:02 am