Log in
Forum » NC-2009 MRc2
Topic

Recycling Facility Letters of Certification

NC-2009 MRc2: Construction Waste Management
posted by John Covello on Sep 19, 2014, 4:05 am

I have a question about doing an overseas project. Do we need some kind of Letters of Certification for the recycling facilities we are using? Do they have to be vetted in some way as a...

Last reply: Jon Clifford, Sep 21, 2014, 4:48 pm

Net vs. Gross tonnage

NC-2009 MRc2: Construction Waste Management
posted by Christine Castellano on Aug 12, 2014, 11:57 am

On a demo project where material was brought to multiple recycling centers, some of the recyclers gave me both net and gross tonnage, and some only gave me pounds, which i converted to net...

Last reply: RETIRED, Aug 12, 2014, 3:17 pm

Pulverized gypsum as landfill cap?

NC-2009 MRc2: Construction Waste Management
posted by Allison Rutter on Jun 10, 2014, 1:37 am

Hi,
I'll be submitting a...

Last reply: Craig Mahoney, Jul 22, 2014, 4:23 pm

Documenting Diversion Quantities

NC-2009 MRc2: Construction Waste Management
posted by Jennifer Kissinger on May 1, 2013, 8:38 am

We have an existing demolition project in which some of the concrete foundations/concrete slabs/block/brick debris can be taken to a recycling facility which will weigh each load, but some of the...

Last reply: Susan Di Giulio, Apr 14, 2014, 7:26 pm

To weigh, or not to weigh?

NC-2009 MRc2: Construction Waste Management
posted by Lawrence Lile on Apr 8, 2014, 8:09 am

We have a project with some existing asphalt pavement that will be busted up and used as clean fill on the same project. Will LEED accept measurements of the length, width and depth of this...

Last reply: RETIRED, Apr 8, 2014, 9:24 pm

Carpet over asbestos tile

NC-2009 MRc2: Construction Waste Management
posted by PATRICK HILLIER on Apr 2, 2014, 8:49 pm

As part of the owners precronstuction abatement flooring adhered to hazardous floor tile was removed by an abatement contractor. Are we correct that all of this material is excluded from...

Last reply: Tristan Roberts, Apr 2, 2014, 11:34 pm

Bonus points?

NC-2009 MRc2: Construction Waste Management
posted by Craig Mahoney on Mar 26, 2014, 12:45 pm

Hello,

I work for a commercial waste hauler and C&D recycling facility. We have recently started recycling scrap drywall from new construction projects. Our process for recycling...

Last reply: RETIRED, Mar 26, 2014, 6:21 pm

Wood reuse

NC-2009 MRc2: Construction Waste Management
posted by Gabriela Crespo on Mar 14, 2014, 2:06 pm

Dear Forum,

We are working on a project where the customer wants to divert...

Last reply: Kathryn West, Mar 14, 2014, 2:24 pm

buidling waste recycled to generate energy (power/heat)

NC-2009 MRc2: Construction Waste Management
posted by Victoria Lockhart on May 14, 2010, 9:56 am

Does anyone have experience of the USGBC accepting EfW (Energy-from-Waste) facilities as recycling? In Europe this is a fairly standard method of diverting waste from landfill and it is here...

Last reply: RETIRED, Mar 10, 2014, 4:56 pm

MRc2 100% diversions

NC-2009 MRc2: Construction Waste Management
posted by Marcio Alberto Casado Pereira on Feb 12, 2014, 7:21 am

Our Project got 100% diversion. This was a result of a very hard work implemented by the builder, the owner and the entire costruction team. They even recycled the wrapping pappers from the...

Last reply: RETIRED, Feb 24, 2014, 8:42 am