Iconic Building with two layers of Facade

NC-2009 PIf2: Project Summary Details
posted by Ahmed Mosa on Jul 29, 2013, 5:48 pm

We are currently working on the design of an iconic building that has 2 layers of facade. The exterior shell is just fins that runs around the main environmental envelope but away "10 Meters"...

Last reply: Kimberly Frith, Aug 5, 2013, 2:27 pm

Gross Floor Area, Mechanical Space

NC-2009 PIf2: Project Summary Details
posted by Gary Ashford on Jul 2, 2013, 5:30 pm

ASHRAE is not specific about deducting for floor openings. For cost estimating and code review, we normally deduct elevator shafts and stairwells. Is this normally accepted during review?

...

Last reply: Kimberly Frith, Jul 16, 2013, 3:36 pm

LEED Boundary/Gross Floor Area for LEED-CI project

NC-2009 PIf2: Project Summary Details
posted by Silvia Ruiz on Jan 16, 2013, 1:13 pm

1. In calculating the...

Last reply: Tristan Roberts, Jul 12, 2013, 1:58 pm

GSF: from exterior or centerline of walls?

NC-2009 PIf2: Project Summary Details
posted by Diana Nezamutinova on Jul 10, 2013, 8:32 am

CS stand-alone building: could the GSF measurements be taken from centerline of walls? Or should it be strictly taken from the exterior faces of exterior walls? Thank you!

Last reply: Kristina Bach, Jul 10, 2013, 12:19 pm

Pedestrian Walkway

NC-2009 PIf2: Project Summary Details
posted by Ashley Sadowski on Jun 24, 2013, 10:13 am

Hello,
We are adding a pedestrian crosswalk to connect the building to the opposite side of the street. This was not required and are hoping to achieve an ID point for including it. Would...

Last reply: Kimberly Frith, Jul 2, 2013, 4:25 pm

Form

NC-2009 PIf2: Project Summary Details
posted by Mike D on Jun 19, 2013, 5:00 am

Hi,
Our project is 133,624 sf.
Within the space usage type table, we have 127,832 sf (which is acceptable as it is only a small difference?)
On the default occupnacy we have the...

Last reply: Kimberly Frith, Jun 20, 2013, 11:25 am

Crawl space included in GSF? Interior courtyards?

NC-2009 PIf2: Project Summary Details
posted by Michael Wironen on Jun 3, 2013, 2:11 pm

We have a fairly complicated building project that includes two areas that are unclear to me as to whether they should be included in the...

Last reply: Kimberly Frith, Jun 6, 2013, 1:38 pm

LEED Project Boundary of vertical attached building

NC-2009 PIf2: Project Summary Details
posted by Nan ZHANG on May 26, 2013, 11:41 pm

Kimberly Frith LEEDuser Basic Member 323 thumbs up May 31, 2013- 4:44 pm Nan, I suggest reading the forums for MPR #2: Must be a complete, permanent building or space as well as MPR #3: Must use a reasonable LEED Boundary and the MPR supplemental guidance document which addresses vertically attached buildings. http://www.leeduser.com/credit/CI-2009/MPR2 http://www.leeduser.com/credit/CI-2009/MPR3 http://www.usgbc.org/DisplayPage.aspx?CMSPageID=2102 Log in or register to post comments ...

Last reply: Kimberly Frith, May 31, 2013, 4:44 pm

Building Footprint

NC-2009 PIf2: Project Summary Details
posted by Josh Sawyer on May 21, 2013, 11:41 am

I am working on a project that already has a building located on the site. We are adding a new building addition to the site. For the building footprint calculation do I include the footprint...

Last reply: Kimberly Frith, May 21, 2013, 9:28 pm

Change of tenant

NC-2009 PIf2: Project Summary Details
posted by Antonio Rodriguez on May 14, 2013, 5:08 pm

in or register to post comments Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11473 thumbs up May 15, 2013- 11:54 am It's all one forum on LEEDuser for PIf2, it just happens...

Last reply: Tristan Roberts, May 15, 2013, 11:54 am