Topic | Recent |
---|---|
CFR and O&M plan informationCI-v4 EAp1: Fundamental commissioning and verificationposted by Michael on Jun 13, 2018, 4:23 am
Hi LEEDusers, My project is an small office pursing CI-v4 in a Core n Shell... |
|
Filling the Minimum Performance Calculator for PAU-AHUsCS-v4 EQp1: Minimum indoor air quality performanceposted by Thien Bui on Jun 5, 2018, 11:07 pm
Hi all, I am working on a Core and Shell project. A Primary Air Handling (PAU) supplies 100% outdoor air to AHUs. Each... Last reply: Andrew Mitchell, P.E., Jun 6, 2018, 11:35 pm |
|
Using a different Energy Consumption in EAc2 to EAc5 to reflect actual conditionsNC-v4 EAc5: Renewable energy productionposted by Tim Middleton on May 29, 2018, 3:10 am
We are working on a Manufacturing Project in Vietnam with very high non-regulated loads (around 75% of the total energy consumption). It is designed without air conditioning, mechanical... Last reply: Tim Middleton, Jun 5, 2018, 3:06 am |
|
Sound transmission- STC vs RwNC-v4 EQc9: Acoustic performanceposted by Indochine Engineering VN on Jul 18, 2017, 4:35 am
Hi, It is told that Rw is very similar to... Last reply: Ken Shook, Apr 24, 2018, 9:37 am |
|
Fuel in baseline when proposed design uses renewables for process energyNC-v4 EAp2: Minimum Energy Performanceposted by Patrick Bivona on Apr 9, 2018, 5:28 pm
Hello, I'm working on a garment factory which energy use is 95% process, steam more specifically. This steam is produced at 40% by a biomass boiler, fueled with agricultural waste. The... Last reply: Scott Bowman, Apr 11, 2018, 3:52 pm |
|
Provide a transportation for pick up/ drop off employeesNC-2009 SSc4.1: Alternative transportation - public transportation accessposted by Hanh Truong on Apr 26, 2017, 11:23 pm
Dear all, I have a factory project located in a remote area which does not have public transportation service. We are seeking for additional points by providing transportation (bus/... Last reply: Muriel Alvarez, Feb 1, 2018, 4:04 pm |
|
Compliance in early constructionNC-v4 SSp1: Construction Activity Pollution Preventionposted by ARDOR GREEN on Jan 27, 2018, 12:49 am
Dear all, A project in construction phase of 6-7 months is currently in the 2nd month. Is it acceptable if that project decides to start creating and implementing... Last reply: Tristan Roberts, Jan 29, 2018, 9:35 am |
|
Fan- interior ventilation EFLHNC-v4 EAp2: Minimum Energy Performanceposted by Michael on Jan 10, 2018, 10:39 pm
Hi, i'm dealing with EFLH for interior ventilation in baseline and propose, over 8000h/year, double than another ones such us space cooling and receptacle EFLH, <4000h/year? ... Last reply: Marcus Sheffer, Jan 12, 2018, 9:34 am |
|
Locate Long-term bicycle parking in basement for residential buildingNC-v4 LTc6: Bicycle facilitiesposted by Indochine Engineering VN on Nov 20, 2017, 2:38 am
Hi, my project is residential building with 3 basements for parking. Is it a must to locate long-term bicycle parking close on the ground floor? Can I consider functional entries are lift lobbies... Last reply: Calie Gihl, Dec 17, 2017, 5:49 pm |
|
Estimate annual energy use of the office outside U.S.CI-v4 EAc4: Renewable energy productionposted by Ameet AA on Nov 23, 2017, 9:28 pm
The project is in Ho Chi Minh city - tropical climate, so there is no demand for heating and the office will use only electricity. According to reference guide, for project not doing... Last reply: Marcus Sheffer, Nov 24, 2017, 12:57 pm |