Log in
Forum » Vietnam
Topic

CFR and O&M plan information

CI-v4 EAp1: Fundamental commissioning and verification
posted by Michael on Jun 13, 2018, 4:23 am

Hi LEEDusers,

My project is an small office pursing CI-v4 in a Core n Shell...

Filling the Minimum Performance Calculator for PAU-AHUs

CS-v4 EQp1: Minimum indoor air quality performance
posted by Thien Bui on Jun 5, 2018, 11:07 pm

Hi all, I am working on a Core and Shell project. A Primary Air Handling (PAU) supplies 100% outdoor air to AHUs. Each...

Last reply: Andrew Mitchell, P.E., Jun 6, 2018, 11:35 pm

Using a different Energy Consumption in EAc2 to EAc5 to reflect actual conditions

NC-v4 EAc5: Renewable energy production
posted by Tim Middleton on May 29, 2018, 3:10 am

We are working on a Manufacturing Project in Vietnam with very high non-regulated loads (around 75% of the total energy consumption). It is designed without air conditioning, mechanical...

Last reply: Tim Middleton, Jun 5, 2018, 3:06 am

Sound transmission- STC vs Rw

NC-v4 EQc9: Acoustic performance
posted by Indochine Engineering VN on Jul 18, 2017, 4:35 am

Hi, It is told that Rw is very similar to...

Last reply: Ken Shook, Apr 24, 2018, 9:37 am

Fuel in baseline when proposed design uses renewables for process energy

NC-v4 EAp2: Minimum Energy Performance
posted by Patrick Bivona on Apr 9, 2018, 5:28 pm

Hello,

I'm working on a garment factory which energy use is 95% process, steam more specifically. This steam is produced at 40% by a biomass boiler, fueled with agricultural waste. The...

Last reply: Scott Bowman, Apr 11, 2018, 3:52 pm

Provide a transportation for pick up/ drop off employees

NC-2009 SSc4.1: Alternative transportation - public transportation access
posted by Hanh Truong on Apr 26, 2017, 11:23 pm

Dear all,

I have a factory project located in a remote area which does not have public transportation service. We are seeking for additional points by providing transportation (bus/...

Last reply: Muriel Alvarez, Feb 1, 2018, 4:04 pm

Compliance in early construction

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by ARDOR GREEN on Jan 27, 2018, 12:49 am

Dear all,

A project in construction phase of 6-7 months is currently in the 2nd month. Is it acceptable if that project decides to start creating and implementing...

Last reply: Tristan Roberts, Jan 29, 2018, 9:35 am

Fan- interior ventilation EFLH

NC-v4 EAp2: Minimum Energy Performance
posted by Michael on Jan 10, 2018, 10:39 pm

Hi,

i'm dealing with EFLH for interior ventilation in baseline and propose, over 8000h/year, double than another ones such us space cooling and receptacle EFLH, <4000h/year?

...

Last reply: Marcus Sheffer, Jan 12, 2018, 9:34 am

Locate Long-term bicycle parking in basement for residential building

NC-v4 LTc6: Bicycle facilities
posted by Indochine Engineering VN on Nov 20, 2017, 2:38 am

Hi, my project is residential building with 3 basements for parking. Is it a must to locate long-term bicycle parking close on the ground floor? Can I consider functional entries are lift lobbies...

Last reply: Calie Gihl, Dec 17, 2017, 5:49 pm

Estimate annual energy use of the office outside U.S.

CI-v4 EAc4: Renewable energy production
posted by Ameet AA on Nov 23, 2017, 9:28 pm

The project is in Ho Chi Minh city - tropical climate, so there is no demand for heating and the office will use only electricity.

According to reference guide, for project not doing...

Last reply: Marcus Sheffer, Nov 24, 2017, 12:57 pm