Log in
Forum » Poland
Loading...
Topic

renovation of multiple non-contiguous parts of an office

CI-2009 MPR2: Must be a complete, permanent building or space
posted by Agata Mozer on Dec 13, 2016, 6:28 am

The owner has a certified office which is located on a few floors of a building. Now he's going to renovate a part of it. On one floor there will be a few non-contiguous parts renovated. I read...

Green Building Education Program

EBOM-2009 IOc1: Innovation in Operations
posted by Agata Mozer on Oct 17, 2016, 4:17 am

Is providing leaflets in the reception of the building and case study on the owner's website enough for the Green Building Education Program?

Last reply: Kristina Bach, Oct 17, 2016, 9:30 am

no permanent workstations

CS-2009 MPR5: Must comply with minimum occupancy rates
posted by Agata Mozer on Oct 11, 2016, 5:46 am

My Client is renovationg a few floors of his office. The renovated floors would only contain canteen, gym and conference rooms without any permanent work stations. Is it possible to certify this...

Sinks in doctor's consulting room

CS-2009 WEp1: Water Use Reduction
posted by Agata Mozer on Sep 29, 2016, 11:30 am

Hi! Do sinks in doctor’s consulting room (a room in which a doctor or other therapeutic practitioner examines patients) must comply with LEED requirements for fixtures and should be included in...

Last reply: Carlie Bullock-Jones, Sep 29, 2016, 3:26 pm

Decorative blue light fixtures

CI-2009 EAc1.2: Optimize energy performance - lighting controls
posted by Agata Mozer on Sep 8, 2016, 3:31 pm

In our office project there are daylight sensors within 15 feet of the windows which are connected to all lighting fixtures in daylit areas except for a few decorative fixtures on the ceiling (...

Last reply: Agata Mozer, Sep 9, 2016, 11:52 am

delivery entrance in a shopping mall

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Agata Mozer on Jul 29, 2016, 11:55 am

We are working on a project of a shopping mall. The building has a few delivery entrances (on the ground level and underground level) next to the delivery docks. These entrances will be used only...

Last reply: Eric Bautista, Sep 9, 2016, 5:29 am

Recycled content in road underlay material

NC-2009 MRc4: Recycled Content
posted by Agata Mozer on Jul 29, 2016, 5:55 am

In our project coal slate which is a waste from a coal mine will be used to create the underlay for the roads and the building. Can this be included in...

Last reply: Agata Mozer, Aug 1, 2016, 6:29 am

CxA contract

CS-2009 EAc3: Enhanced Commissioning
posted by Agata Mozer on May 23, 2016, 9:03 am

Can Commissioning Authority be contracted through the design firm (architects) as part of the LEED certification contract (...

Last reply: David Edenburn, Jul 26, 2016, 10:35 pm

dedicated exhaust

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Agata Mozer on Feb 8, 2016, 6:51 am

I would like to make sure what does "dedicated/designated exhaust" mean. Can all hazardous gas and chemical use areas have one exhaust system combined with the exhaust from toilets or does every...

Last reply: Lyle Axelarris, Jul 25, 2016, 4:14 pm

ASHRAE requirements for dry-coolers

CS-2009 EAp2: Minimum Energy Performance
posted by Agata Mozer on Jun 29, 2016, 9:30 am

Cooling system in our project (shopping mall) consists of dry-coolers sprayed with water. What are ASHRAE efficiency requirements for dry-coolers? Should they be qualified as air-cooled...

Last reply: Agata Mozer, Jul 4, 2016, 3:38 am