Log in
Forum
Loading...
Topic

Estimating the Peak Visitors

CS-v4 LTc6: Bicycle facilities
posted by Ciaran McCabe on May 7, 2019, 11:17 am

Hi,

Is there an accepted methodology for calculating the number of peak visitors. I am working on a Core & Shell Office therefore its not straightforward to estimate ?

This...

Last reply: David Posada, May 7, 2019, 7:36 pm

ISO 140001 Certification

NC-2009 IDc1: Innovation in Design
posted by kathy zarsky on Nov 27, 2012, 6:45 pm

Has anyone had any success in receiving an innovation credit point for this with LEED version 2009?

Last reply: Miguel Rivera, May 7, 2019, 4:28 pm

ISO 14001 Certified EMS- Innovation Credit?

NC-v4 INc1: Innovation
posted by Miguel Rivera on May 7, 2019, 3:30 pm

Reposting this question from LEED 2009. Has anyone received guidance on whether this is an acceptable Innovation credit (ISO 14001 Certified EMS) for LEEDv4 projects? 

Thanks, 

LEED Boundary

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Miguel Rivera on May 7, 2019, 9:30 am

Hi,
Our project has two buildings, one to be certified and the other next to the building is a parking garage. We want to know if the parking garage needs to be included in the LEED...

Last reply: Miguel Rivera, May 7, 2019, 2:10 pm

Version 4.1 icons not appearing on LEED Online

LEED v4.1 Discussion Forum
posted by Harry Flamm on May 7, 2019, 12:49 pm

One of my V4 LEED Online projects doesn't show the arrow icons for switching to V4.1, though my other projects do show them.  Is there some master "toggle-switch...

Exemplar performance as per the previous V4

CS-v4.1 LTc7: Reduced parking footprint
posted by Ciaran McCabe on May 7, 2019, 11:43 am

Hi,

If I am pursuing Reduced Parking Footprint under LEED v4.1 is possible to achieve exemplar performance as per the previous V4 ?

Thanks.  

FSC Street bench

NC-2009 MRc7: Certified Wood
posted by Anna Larina on May 6, 2019, 10:40 am

Hello everyone,

I am working on the project in Russia and I would like to pursue this credit by permanent installing of a...

Last reply: Emily Purcell, May 7, 2019, 10:21 am

LCA Baseline

NC-v4 MRc1: Building life-cycle impact reduction
posted by Elizabeth Repin on May 6, 2019, 12:48 pm

Hello:

Can we only change envelope assemblies for baseline; do all other items to be the same as the proposed building? 

Thank You! 

CDPH Method v1.2?

NC-v4 EQc2: Low emitting materials
posted by Erica Downs on May 6, 2019, 12:26 pm

Is this an acceptable version?

LEED v4.1 makes changes for commingled waste in Option 1- What do you think?

NC-v4 MRc5: Construction and demolition waste management
posted by Michelle Reott on Jan 23, 2019, 3:21 pm

I'm hopeful that everyone on this forum has seen the BD+C LEED v4.1 new language for MRc5 regarding...

Last reply: Emily Purcell, May 6, 2019, 10:51 am