Log in
Forum
Loading...
Topic

Open Aircraft Hangar, No HVAC

NC-v4 EAc2: Optimize Energy Performance
posted by Adam Fitzpatrick on Jun 5, 2019, 10:58 am

We are designing an open aircraft hangar in southern Alabama that will not have any HVAC equipment.  How would we go about pursuing Optimize Energy Performance credits?

My initial thought...

Last reply: Adam Fitzpatrick, Jun 7, 2019, 12:05 pm

LEED v4 Interior Lighting Quality Option 2, Strategy A

NC-v4 EQc6: Interior lighting
posted by Kera Lagios on Jul 15, 2016, 6:27 pm

that meets this criteria. If anyone does find one, let the forum know! The best way around this is to use direct/indirect lighting or indirect only lighting. It's a little unclear in the LEED Guide,...

Last reply: Maria Porter, Jun 7, 2019, 8:47 am

Water meter installation location

EBOM-v4 WEp1: Indoor water use reduction
posted by Shathiswara Rao on Jun 6, 2019, 9:39 pm

 The potential way to target water reduction is by monitoring the water use for flushing. Is it necessary to install a water meter for each piping that goes to separate toilets? or we can fix one...

MRc1 Option 3

NC-v4 MRc1: Building life-cycle impact reduction
posted by Barbara Clarke on Jun 6, 2019, 4:07 pm

We have the calculations sf for our existing exterior...

Renewable Energy Generation

ND-v4 GIBc11: Renewable energy production
posted by Jeff Forward on Jun 5, 2019, 2:45 pm

This credit requires a certain percentage of...

Last reply: Eliot Allen, Jun 6, 2019, 12:08 pm

Local utility using green power sources

NC-2009 EAc6: Green Power
posted by Emily Purcell on Sep 25, 2018, 5:07 pm

Curious if anyone has submitted this strategy, successfully or not, or has any other insight - I took over this project after construction documentation was finished so I'm not sure what the...

Last reply: Allison Smith, Jun 6, 2019, 10:31 am

Renewable Energy Production

NC-v4.1 EAc5: Renewable energy
posted by Jeff Forward on Jun 5, 2019, 3:02 pm

NC v4.1 talks about offsetting a percentage of greenhouse gas emissions.  How are...

Mixed use projects: Retail credits and Commercial Interiors credits

CI-v4 EQc6: Interior lighting
posted by Eliza Mauro on Jun 6, 2019, 7:17 am

Hi all,

I'm working in a fit out project of a mixed use building that will be a visitor center with retail, exhibition, bar and office areas. We have registered the project as a Commercial...

"durability"

NC-v4 EAp1: Fundamental commissioning and verification
posted by Tom Kennedy on Jun 5, 2019, 6:39 pm

The Pre-req...

Anyone submitted this for review yet?

Pilot-Credits IPpc93: Prevention through design
posted by emily reese moody on Jun 5, 2019, 3:41 pm

Like Logan's post below, we are pursuing this Pilot Credit, but feel it would be especially useful to know how much information/detail they expect for each line item required. 

Has anyone...