Pilot Credit 87- Verified Construction and Demolition RatesPilot-Credits MRpc87: Verified Construction & Demolition Recycling Ratesposted by Patricia Lloyd on Feb 12, 2018, 1:22 pm
Documentation of this credit was easy because we are using a hauler who has a CORR certified facility that is near to our job. We tried this pilot credit once before and did not achieve it... Last reply: Kavita, Dec 29, 2020, 11:19 pm |
|
Surface Testing ProcessPilot-Credits INpc137: Safety First: Cleaning and Disinfecting Your Spaceposted by Zeynep Cakir on Dec 29, 2020, 7:35 am
Dear fellows, Does anyone have any idea or recommendations on how to determine the surface cleanliness? How should we perform the quantitative testing? What kind of tools or equipment will... |
|
Filtration Requirement for a Evaporative Cooling SystemNC-v4 EQp1: Minimum indoor air quality performanceposted by Krithikha Muthukrishnan on Dec 28, 2020, 5:32 am
Hi, We are working on a Project which is a large scale Manufacturing space. The Project is planning to install a direct only Evaporative Cooling system which draws in Outside air directly... Last reply: Krithikha Muthukrishnan, Dec 29, 2020, 5:52 am |
|
Including racks in the assessmentNC-v4 MRc1: Building life-cycle impact reductionposted by Agnieszka Kaczmarek on Dec 14, 2020, 8:35 am
According to Option 4: can I include in the assessment metal racks in a warehouse? Obviously, they are not a part of construction of the building, but because of its large quantity it seems... Last reply: Agnieszka Kaczmarek, Dec 29, 2020, 2:36 am |
|
Exterior Building Lighting façade- MANDATORY PROVISIONS ASHRAE 90.1- 2010NC-v4 EAp2: Minimum Energy Performanceposted by Sara ALIA YOUSSOUFI on Dec 21, 2020, 7:52 am
We are currently developing a large-scale lighting project for which we need to clear up some doubts about ASHRAE 90.1 regulations – section 9.4 – 2010 regarding exterior facade lighting. ... Last reply: Marcus Sheffer, Dec 28, 2020, 12:48 pm |
|
Green Power Five Year ContractsNC-v4 EAc7: Green power and carbon offsetsposted by Sean Hogan on Feb 28, 2017, 7:14 am
I work for a corporate client seeking the... Last reply: Heather Schrock, Dec 28, 2020, 11:20 am |
|
Number of Units Required to be SampledNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Abena Darden on Feb 2, 2015, 5:03 pm
We are working on a high-rise residential project in San Francisco. I see a question relating to how many residential units need to be blower door tested dating from June 24 2014. We do not see... Last reply: riiupw epics, Dec 24, 2020, 2:57 pm |
|
polyisocyanurate roof insulationNC-v4.1 EQc2: Low-emitting materialsposted by Allen Cornett on Dec 23, 2020, 3:50 pm
Does polyisocyanurate roof insulation on top of a concrete or metal deck need to be included in the documentation of the low-emitting materials insulation category? Last reply: Allen Cornett, Dec 24, 2020, 11:09 am |
|
"ready for review" status in Design Final Review DecisionCS-2009 IDc2: LEED Accredited Professionalposted by sofia la cognata on Nov 10, 2020, 6:17 am
Good Morning, we have submitted this credit in the design review, but in the Design Final Review Decision the status is "ready for review" and not "anticipated" like the others. Can you... Last reply: John Reesnk, Dec 24, 2020, 4:30 am |
|
Manufacturing waste for complianceWarehouses-EBOM-v4 MRc4: Solid waste management - ongoingposted by FARIZAN DAVEZAC on Dec 23, 2020, 9:36 pm
I have a warehouse with a manufacturing area. The waste from the manufacturing area is already being diverted, as it's collected by a recycling facility. Can we count this part (manufacturing... |