Log in
Forum » NC-2009 EAc1
Loading...
Topic

Modeling semi heated space in baseline case

NC-2009 EAc1: Optimize Energy Performance
posted by Gopinath Vasu on Jan 21, 2016, 11:47 am

Hi All,

I am working on a project with warehouse space which is heated and ventilated with heating capacity greater than 3.5...

Last reply: Gopinath Vasu, Jan 23, 2016, 11:52 pm

Energy Performance: Automated Lightning and HVAC system

NC-2009 EAc1: Optimize Energy Performance
posted by Marco Valerio Ceccotti on Dec 15, 2015, 11:52 am

We Desined a Dormitory Building ( NC ) already constructed and in operation.
Each door of the bedrooms has a card reader connected to a BMS ( Building Management System ). When the card is...

Last reply: Marco Valerio Ceccotti, Dec 18, 2015, 1:14 pm

Exterior lighting- Baseline Building

NC-2009 EAc1: Optimize Energy Performance
posted by VICTOR MORENO on Dec 18, 2015, 10:33 am

To simulate the exterior lighting in Baseline Building, i have to model it according table 9.4.5 of Standard 90.1?

Or it is not possible to earn points for exterior lighting systems?

...

Last reply: Marcus Sheffer, Dec 18, 2015, 10:45 am

Baseline HVAC System

NC-2009 EAc1: Optimize Energy Performance
posted by Ciaran McCabe on Dec 10, 2015, 11:18 am

Hi,

When determining the most suitable Baseline HVAC System to use, as this is a function of building area and number of floors. Would you count a basement car park as a "floor". My...

Last reply: Marcus Sheffer, Dec 10, 2015, 7:02 pm

Help modeling heating only building

NC-2009 EAc1: Optimize Energy Performance
posted by Logan Dorrell on Nov 6, 2015, 12:01 pm

We are modeling a building in EnergyPro that is heating only, with radiant heating panels and ventilation thru DOAS.

We received a LEED review comment stating: "If the heating output...

Last reply: Marcus Sheffer, Nov 6, 2015, 2:58 pm

LEED 2009 Energy Updates

NC-2009 EAc1: Optimize Energy Performance
posted by Theresa Lehman on Sep 30, 2015, 5:23 pm

Did anyone see the that USGBC has launched a set of proposals to increase the energy minimums for LEED v2009, which is open for project registration until October 31, 2016. Please visit:...

Last reply: Scott Bowman, Oct 19, 2015, 3:35 pm

Ventilated Only Space Simulation

NC-2009 EAc1: Optimize Energy Performance
posted by TOMAS URIBE on May 6, 2014, 1:42 pm

Hello Marcus!

In the HVAC design of a project, there is a space where supply ventilation is included in order to accomplish the minimum amount of air required by ASHRAE 62.1-2007 standard...

Last reply: Marcus Sheffer, Oct 2, 2015, 4:16 pm

Rounding of Percent Energy Cost Savings for EAc1 Points

NC-2009 EAc1: Optimize Energy Performance
posted by Joseph Chappell on Aug 13, 2015, 2:53 pm

Hi all,

We recently received a final design review where our percent energy cost savings have been corrected by the reviewer to show 31.95%. This project is an existing building...

Last reply: Christopher Schaffner, Sep 14, 2015, 10:04 am

DES Option 2 when project contains the DES

NC-2009 EAc1: Optimize Energy Performance
posted by Stephanie Graham on Sep 9, 2015, 5:34 pm

Project is LEED-NC v2009 project in which a building contains a...

Last reply: Marcus Sheffer, Sep 10, 2015, 11:35 am

Group Certification NC V3 EAc1

NC-2009 EAc1: Optimize Energy Performance
posted by Neil Rosen on Sep 9, 2015, 1:19 pm

I am working on a project that consists of 2 buildings on one site that I plan on certifying using the Group Certification option discussed in the LEED Campus Guidance document.

In...

Last reply: Marcus Sheffer, Sep 9, 2015, 2:15 pm