Log in
Forum » Canada
Topic

Envelope CxA within the engineering company part of design team?

NC-v4 EAc1: Enhanced Commissioning
posted by Erika Roy on Apr 23, 2019, 1:59 pm

Hello,

We want to use a building envelope...

Last reply: Scott Bowman, Aug 11, 2019, 6:09 pm

BOD review from the BECx consultant

NC-v4 EAc1: Enhanced Commissioning
posted by Julie Trottier on Jun 4, 2019, 11:44 am

Good Morning,

In order to pursue the EAc1 option 2 , we are the building envelope...

Last reply: Scott Bowman, Aug 11, 2019, 6:01 pm

LEED V4.1 EBO+M Minimum Program Requirements

LEED v4.1 Discussion Forum
posted by Ben McEwen on Aug 7, 2019, 11:57 am

I cannot verify that LEED V4.1 EBO+M requires fulfillment of the usual MPRs that have been required for previous versions (permanent location, site boundaries, etc.). V4 does use these MPRs for...

option 2- Is Land donation acceptable as alternate?

NC-v4 SSc2: Site development - protect or restore habitat
posted by Navisa Jain on Nov 9, 2018, 2:25 pm

Hi,

Does land donated to a national entity for conservation qualify instead of financial support? 

Last reply: Trista Little, Jul 28, 2019, 9:31 pm

Systems Narrative Template

EBOM-v4.1 EAp1: Energy Efficiency Best Management Practices
posted by Ben McEwen on Jul 19, 2019, 2:35 pm

Hi,

I'm wondering if I can use the same BAS System Narrative Template from V2009 for V4.1?

Thanks,

Ben

Last reply: David Hubka, Jul 20, 2019, 8:53 am

Data Storage Requirement

NC-v4 EAc3: Advanced Energy Metering
posted by Shannon Oletic on Jul 18, 2019, 2:04 pm

Hello,

Most digital metering systems with remote access capabilities have a cloud-based system were data can be stored indefinitely, or until the meter becomes inactive. Looking...

Last reply: Marcus Sheffer, Jul 19, 2019, 5:09 pm

LEED ND v4 Pilot Credit Integrative Process- Participation in the Forum

ND-Plan-v4 INc1: Innovation
posted by Charlotte Bodnar on Jul 15, 2019, 12:04 pm

As part of the requirements for this pilot credit, we are noting our participation in the Forum for a project located in Montreal that aims the LEED ND v4 certification.

Since our project...

Last reply: Eliot Allen, Jul 15, 2019, 12:40 pm

LEED ND v4 Pilot Credit Integrative Process- Participation in the Forum

Pilot-Credits IPpc101: Integrative process
posted by Charlotte Bodnar on Jul 15, 2019, 10:47 am

As part of the requirements for this pilot credit, we are noting our participation in the Forum for a project located in Montreal that aims the LEED ND v4 certification.

A list of team...

Construction Activity pollution prevention inspections

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by Irene Carreno on Aug 17, 2017, 1:27 pm

Hello.
I am working in a project that has the Erosion and control plan following the...

Last reply: Jose Gonzalez, Jul 10, 2019, 4:18 pm

Total Building Energy Use

EBOM-v4.1 EAc1: Energy Performance
posted by Ben McEwen on Jun 13, 2019, 3:50 pm

to the forum.  Log in or register to post comments ...

Last reply: David Hubka, Jun 17, 2019, 11:01 pm