Topic | Recent |
---|---|
Managing rainwater in clay soil with low permeabilityCS-v4 SSc4: Rainwater managementposted by Maria Glädt on Aug 17, 2016, 9:26 am
Hi, Our project site is a landfill area which was used as a parking during the construction of a tunnel located nearby. The site consists on very low permeable soil (mainly clay). There is... Last reply: Michael DeVuono, Oct 24, 2017, 10:12 am |
|
Pilot credit wakable siteCS-v4 INc1: Innovationposted by Tobias Berge on Sep 7, 2017, 4:53 am
We chose to achieve a pilot credit called wakable sites. Unfortunately we discoverad that the credit is closed. We have register the project on LEED online but not registered this specific credit... Last reply: Tristan Roberts, Sep 9, 2017, 3:04 am |
|
Increased ventilation instead of alarms?NC-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Maria Porter on Aug 23, 2017, 3:11 am
I understand that for densely occupied spaces an alarm (visible or audible) is required. If a sensor was installed in the room, but instead of beeping/flashing it would increase the ventilation... Last reply: Andrew Mitchell, P.E., Aug 30, 2017, 8:54 pm |
|
Renewable EnergyCI-v4 EAc4: Renewable energy productionposted by Maria Glädt on Dec 17, 2014, 2:05 pm
See quotation from LEED-CI. "Use tenant... Last reply: Marcus Sheffer, Aug 28, 2017, 10:22 am |
|
Renewable Energy in CS projectCI-v4 EAc4: Renewable energy productionposted by Sara Johansson on Mar 29, 2017, 9:36 am
Is the tenant obliged to install additional... Last reply: Marcus Sheffer, Aug 28, 2017, 10:17 am |
|
PPA as renewable energy production?CS-v4 EAc5: Renewable energy productionposted by Lai-San wong on Jun 12, 2017, 9:38 am
Hi! In the requirement for EAc5 (BD+C) it is stated: Last reply: Marcus Sheffer, Aug 28, 2017, 9:41 am |
|
Bicycle Storage for residential part in mixed used buildingCS-v4 LTc6: Bicycle facilitiesposted by Malti Gupta on Jul 26, 2017, 2:15 am
I'm working on mixed used LEED CS v4 project. we have Offices, retail & residential areas. To calculate bicycle storage & shower for offices & retails we considered the default... Last reply: Tristan Roberts, Aug 26, 2017, 1:16 pm |
|
Peak building users (FTE + Peak Transients)CS-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Sara Johansson on Jun 20, 2017, 4:57 am
I am working on a LEED v.2009 CS project, using deafault occupancy Core and Shell Appendix 1. I assume that... Last reply: Sara Johansson, Jun 20, 2017, 6:25 am |
|
Changing FacilitiesCS-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Sara Johansson on Jun 20, 2017, 4:34 am
I am working on a LEED CS v.2009 project greater than 300 000 sf. Last reply: Charles Nepps, Jun 20, 2017, 5:15 am |
|
EPDs used in CS project, can be accounted for in CI project?CI-v4 MRc3: Building product disclosure and optimization - environmental product declarationsposted by Sara Johansson on Mar 31, 2017, 10:00 am
If a CI project is located in a CS building and the tenant requires no fit out, can EPDs for products in the tenants space in the CS certification be used for the CI certification? And so forth... Last reply: Nadav Malin, Apr 10, 2017, 10:26 am |