Automatic Daylighting Controls for guest rooms (hotel) in Section 9.4.1.4

NC-2009 EAp2: Minimum Energy Performance
posted by Laia Pons on Nov 12, 2019, 12:19 pm

I have a Hotel with guest rooms bigger than 23 m2, could anybody advise if all the guest rooms (enclosed spaces bigger than 23 m2) should have Automatic Daylighting Controls ?

Last reply: Marcus Sheffer, Nov 15, 2019, 9:33 am

Benchmarking tool

EBOM-v4 EAp2: Minimum Energy Performance
posted by Helena Garcia on Nov 5, 2019, 10:47 am

Hi everybody, 

We are working on the pre-evaluation of a LEED v4 -...

NC-2009 SSc5.2- Desarrollo del sitio: maximizar el espacio abierto

NC-2009 SSc5.2: Site development - maximize open space
posted by Maria Dolores Juri on Oct 7, 2019, 10:49 am

Hello! 

Im wondering if the concept of "Open space" include vegetated interior areas within a project, or if it´s just exterior areas, because in the project which I am working with, there...

NC-2009 SSc5.1- Site Development—Protect or Restore Habitat- VEGETATED AREAS

NC-2009 SSc5.1: Site development - protect or restore habitat
posted by Maria Peralta on Sep 18, 2019, 7:14 am

Hello!,

I have a doubt regarding to this credit.

I want to know if orchards, hydroponics and walls with plants, can be considered as a vegetated areas to be count as restored...

Is installing more than one water meter per subsystem ok?

NC-v4 WEc4: Water metering
posted by Pablo Muñoz on Sep 17, 2019, 6:15 am

The credit is not specific enough (as it is in the energy metering credit). Does installing several meters for different areas of the irrigation area (located in different parts of the project)...

Last reply: Dave Hubka, Sep 17, 2019, 2:21 pm

What could be considered as "physically accesible"?

NC-v4 SSc3: Open space
posted by Pablo Muñoz on Sep 12, 2019, 10:59 am

Could we consider physically accesible a roof open to all tenants but without an elevator (the only way to get there is through the stairs)?

EAp1-Fundamental Commissioning and Verification- OPR / BOD

NC-v4 EAp1: Fundamental commissioning and verification
posted by Maria Peralta on Jul 26, 2019, 3:38 am

Hello, I have a question regarding the...

Last reply: Scott Bowman, Aug 11, 2019, 5:26 pm

we c1

NC-v4 WEp1: Outdoor water use reduction
posted by Maria Peralta on Jul 24, 2019, 10:18 am

Hello! 

I have an enquiry regarding this credit.

The LEED guide says  that food gardens may be include or exclude in the calculations at the project team discretion.

So if I...

Last reply: Trista Brown, Jul 28, 2019, 9:21 pm

LTc7- Reduce parking footprint- examplary performance

NC-v4 LTc7: Reduced parking footprint
posted by Maria Peralta on Jul 3, 2019, 10:27 am

Hello!  

I got a question regarding the credit LTc7.The project wich I am working with, doesnt have a parking, so, at is says in the leed guide "Projects with no associated off-street...

Last reply: Bipin Karki, Jul 18, 2019, 8:18 am

Campus possiblity

Schools-EBOM-v4 MPR3: Must comply with project size requirements
posted by Helena Garcia on Jun 27, 2019, 4:23 am

Nadav Malin President BuildingGreen, Inc. LEEDuser Moderator 839 thumbs up June 27, 2019- 7:43 am Hi Helena, I haven't dealt with campus projects myself, so I don't have a good answer for you. But there is a separate forum on LEEDuser for " LEED Guidance for Campuses and Multiple Buildings." I suggest that you repost your question there, where more knowledgeable people may be hanging out. Log in or register to post comments Helena Garcia Sustainability consultant PGI ENGINEERING LEEDuser Basic Member 5 thumbs up July 9, 2019- 3:49 am Hello nadav Thank you very much, so I'll...

Last reply: Helena Garcia , Jul 9, 2019, 3:49 am