Topic | Recent |
---|---|
Future open space preservation- Campus projectNC-v4 SSc3: Open spaceposted by Andy Rhoades on Jan 17, 2023, 1:46 pm
My question is regarding a multi-phased campus project. Are we able to count future planned open space towards the credit threshold, and if so, what documentation would this require (i.e. plans,... Last reply: Afogreen Build, Mar 11, 2024, 8:50 pm |
|
Lighting Control in blood draw spacesHealthcare-v4 EQc6: Interior lightingposted by Heather Belsey on Mar 11, 2024, 3:56 pm
For the lighting credit you need to have individual controls at 90% of patient positions. LEED defines patient positions as: A patient bed, infusion chair, recovery... |
|
Commissioning near end of constructionNC-v4 EAp1: Fundamental commissioning and verificationposted by Nadia Azzam on Mar 7, 2024, 10:37 am
We have been handed over a project aiming for LEED Gold that was delayed due to COVID and previously managed by a different LEED admin who has since left the company. After reviewing the... Last reply: Dave Hubka, Mar 8, 2024, 9:33 am |
|
Partial Floor LEED CertificationCI-v4 MPR3: Must comply with project size requirementsposted by Edgar Arevalo on Mar 7, 2024, 12:14 am
I have a project that is a partial floor fit-out where the client would like that partial space to be LEED certified. The project space is approximately 52% - 60% of the total floor area, but it... |
|
Existing PV on previously certified projectNC-v4 EAc5: Renewable energy productionposted by Yu Zhang on Feb 13, 2019, 3:33 pm
I have a project that is a new building located on a previous certified LEED project with PV production. The previous project had >90% offset by energy use and >100% offset by cost from... Last reply: Marcus Sheffer, Mar 6, 2024, 12:20 pm |
|
50% surface area reuseCI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Mark Ragucci on Jan 15, 2020, 9:40 am
how is this credit calculated? can in include existing floor slab and deck? we are leaving a portion of the exiting walls that are about 20ft tall and our ceilings will be at 9'. can i calculate... Last reply: Stephani Carter, Mar 5, 2024, 7:34 pm |
|
"Everything within the waterproofing membrane"NC-v4.1 EQc2: Low-emitting materialsposted by James Keohane on Jun 24, 2020, 12:14 pm
The credit language states that materials which must meet the requirements are "everything within the waterproofing membrane." The waterproofing membrane itself ( e.g.... Last reply: Adrienne Lynn, Feb 28, 2024, 4:36 pm |
|
Determining Retention RequirementsNC-v4.1 SSc4: Rainwater managementposted by Callie Reymann on Feb 28, 2024, 12:40 pm
Our rainwater calculations are right on the cusp of reaching the 90th percentile and earning the full three points (+ regional priority point) for this credit. In fact, our calculations met the... |
|
Waste performance yields a score of zero points in ARCEBOM-v4.1 MRp3: Waste Performanceposted by jimmy Adames on Feb 26, 2024, 1:50 pm
Hi, Our building is a very automated distribution center for an apparel company. Due to the nature of the business, we receive cardboard cases with product and before it ships to customers, all... |
|
One-time air testing: how to enter readings in the ARC platformEBOM-v4.1 EQp4: Indoor Environmental Quality Performanceposted by jimmy Adames on Feb 26, 2024, 1:35 pm
Greetings, I have a few questions regarding this credit.
|