Topic

All open space that is counted toward this credit will be preser

NC-2009 SSc5.2: Site development - maximize open space
posted by Agata Mozer on Jun 9, 2016, 8:53 am

As part of this credit the Investor has to confirm that "All open space that is counted toward this credit will be preserved for the life of the building". My client wants to apply for this...

Last reply: Tristan Roberts, Jan 17, 2017, 5:48 pm

Which ASHRAE & LEED should I base my simulation on?

NC-2009 EAp2: Minimum Energy Performance
posted by Olaf Dybinski on Jan 11, 2017, 7:45 am

Hello, I have a problem with choosing a basis for my simulation.
I have a building that was designed in 2015 and is about to be build. I need to perform simulations for "Optimize Energy...

Last reply: Olaf Dybinski, Jan 12, 2017, 3:04 am

renovation of multiple non-contiguous parts of an office

CI-2009 MPR2: Must be a complete, permanent building or space
posted by Agata Mozer on Dec 13, 2016, 6:28 am

The owner has a certified office which is located on a few floors of a building. Now he's going to renovate a part of it. On one floor there will be a few non-contiguous parts renovated. I read...

Green Building Education Program

EBOM-2009 IOc1: Innovation in Operations
posted by Agata Mozer on Oct 17, 2016, 4:17 am

Is providing leaflets in the reception of the building and case study on the owner's website enough for the Green Building Education Program?

Last reply: Kristina Bach, Oct 17, 2016, 9:30 am

no permanent workstations

CS-2009 MPR5: Must comply with minimum occupancy rates
posted by Agata Mozer on Oct 11, 2016, 5:46 am

My Client is renovationg a few floors of his office. The renovated floors would only contain canteen, gym and conference rooms without any permanent work stations. Is it possible to certify this...

Sinks in doctor's consulting room

CS-2009 WEp1: Water Use Reduction
posted by Agata Mozer on Sep 29, 2016, 11:30 am

Hi! Do sinks in doctor’s consulting room (a room in which a doctor or other therapeutic practitioner examines patients) must comply with LEED requirements for fixtures and should be included in...

Last reply: Carlie Bullock-Jones, Sep 29, 2016, 3:26 pm

Decorative blue light fixtures

CI-2009 EAc1.2: Optimize energy performance - lighting controls
posted by Agata Mozer on Sep 8, 2016, 3:31 pm

In our office project there are daylight sensors within 15 feet of the windows which are connected to all lighting fixtures in daylit areas except for a few decorative fixtures on the ceiling (...

Last reply: Agata Mozer, Sep 9, 2016, 11:52 am

delivery entrance in a shopping mall

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Agata Mozer on Jul 29, 2016, 11:55 am

We are working on a project of a shopping mall. The building has a few delivery entrances (on the ground level and underground level) next to the delivery docks. These entrances will be used only...

Last reply: Eric Bautista, Sep 9, 2016, 5:29 am

Recycled content in road underlay material

NC-2009 MRc4: Recycled Content
posted by Agata Mozer on Jul 29, 2016, 5:55 am

In our project coal slate which is a waste from a coal mine will be used to create the underlay for the roads and the building. Can this be included in...

Last reply: Agata Mozer, Aug 1, 2016, 6:29 am

CxA contract

CS-2009 EAc3: Enhanced Commissioning
posted by Agata Mozer on May 23, 2016, 9:03 am

Can Commissioning Authority be contracted through the design firm (architects) as part of the LEED certification contract (...

Last reply: David Edenburn, Jul 26, 2016, 10:35 pm