Log in
Forum
Loading...
Topic

Anyone been through full review of this credit yet?

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by Joanna Switzer on Oct 26, 2017, 2:57 pm

Just curious if anyone has lessons learned on this one yet?

I am researching feasibility/ realistic attainability of this credit. I noticed Sherwin Williams has created some...

Last reply: Summer Minchew, Jul 9, 2019, 11:06 am

Who can be a qualified CXA to do the LEED V4 Enhanced Commissioning in the Design Build Project?

NC-v4 EAc1: Enhanced Commissioning
posted by Benchito Herrera on Jul 8, 2019, 11:06 pm

Can a Gen. Contractor hire a CXA  in the Design Build Project  for LEED  V4 Enhance Commisioning?What are the requirements?

Thanks.. 

Last reply: David Hubka, Jul 9, 2019, 10:04 am

EnergyPlus building geometry Errors

NC-2009 EAp2: Minimum Energy Performance
posted by Fatou Jabbie, | BSc. Comp. Sci. | MSc. Sustainability Management | LEED AP BD+C on Jul 5, 2019, 1:35 pm

Marcus Sheffer LEED Fellow, 7group / Energy Opportunities LEEDuser Expert 5521 thumbs up July 8, 2019- 2:57 pm These forums are generally no the best for getting answers related to specific software issues. I would try the EnergyPlus help desk or maybe the forums on this page-  http://energy-models.com/   Log in or register to post comments Cory Duggin Energy Project Engineer, TLC Engineering for Architecture LEEDuser Premium Member 40 thumbs up July 8, 2019- 4:26 pm https://unmethours.com/questions/  has a lot of EnergyPlus users answering questions too. Log in or register to post comments Fatou Jabbie,...

Last reply: Fatou Jabbie, | BSc. Comp. Sci. | MSc. Sustainability Management | LEED AP BD+C, Jul 9, 2019, 10:00 am

MR BPD&O Calculator v4.1

NC-v4.1 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Agata Mozer on Apr 15, 2019, 7:50 am

Hello,

I would like to replace the v4 credit with v4.1 equivalent and track the credit status via appropriate calculator. Could you tell me where can I find the right editable document?...

Last reply: Anastasia Huggins, Jul 9, 2019, 9:22 am

CEE Tier 3A Washer Requirement

NC-v4 WEp2: Indoor water use reduction
posted by Katie Herber on Jul 21, 2016, 3:10 pm

This prerequisite calls for all commercial washing machines to meet CEE Tier 3a, however the CEE website indicates that the commercial washing machine program is currently suspended in order to...

Last reply: marie-eve lachance, Jul 9, 2019, 6:02 am

Campus possiblity

LEED Guidance for Campuses and Multiple Buildings
posted by Helena Garcia on Jul 9, 2019, 3:51 am

Hello LEEDusers!

We are working with a new project and we are thinking to a possible campus certification. The team has a question about it because it would be our first campus...

Campus possiblity

Schools-EBOM-v4 MPR3: Must comply with project size requirements
posted by Helena Garcia on Jun 27, 2019, 4:23 am

Nadav Malin LEED Fellow, President, BuildingGreen, Inc. LEEDuser Moderator 810 thumbs up June 27, 2019- 7:43 am Hi Helena, I haven't dealt with campus projects myself, so I don't have a good answer for you. But there is a separate forum on LEEDuser for " LEED Guidance for Campuses and Multiple Buildings." I suggest that you repost your question there, where more knowledgeable people may be hanging out. Log in or register to post comments Helena Garcia Bioconstruction, Green Building Management LEEDuser Basic Member 3 thumbs up July 9, 2019- 3:49 am Hello nadav Thank you very...

Last reply: Helena Garcia, Jul 9, 2019, 3:49 am

Concrete Mixes Counting as Separate Products- One EPD

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Summer Gorder on Jul 2, 2019, 11:49 am

The Concrete supplier utilized multiple "mixes" of concrete in the project. A mix has slightly different functions, which I think would mean it is a separate product based on the USGBC definition...

Last reply: Craig Graber, Jul 8, 2019, 6:53 pm

Zero Lot Line Deveoped Site

CS-2009 SSc6.1: Stormwater design - quantity control
posted by Guillermo Hernandez Espinoza on Jul 8, 2019, 5:54 pm

Hi everyone.

We are working on a zero lot line site where an old building was demolished in order to start with the new one.
The old building was composed only by hardscapes.
...

Last reply: Michael DeVuono, Jul 8, 2019, 6:46 pm

Green Energy

LEED v4.1 Discussion Forum
posted by David Stern on Jun 24, 2019, 6:17 pm

Which of the following is Clean Energy... Laser Power, Hydro, Nuclear, Burning Dung, Methane, Clean Coal, Geothermal and/ or National Gas? Thank You 

Last reply: David Posada, Jul 8, 2019, 6:39 pm