Log in
Forum
Loading...
Topic

LEED 2009 Credit SSc2 Development Density and Community Connectivity

NC-2009 SSc2: Development Density & Community Connectivity
posted by Andrew Buck on Aug 13, 2019, 10:22 am

Hello, we are working on a Hotel Project in Chicago, where we had 10 basic services within a 1/2 mile radius, but one of the services (Convenience Market) has closed in the last year (during...

Last reply: Allison Smith, Aug 14, 2019, 1:12 pm

Percentage Improvement using GHG emission metric

NC-v4.1 EAc2: Optimize Energy Performance
posted by Pan Pan on Aug 14, 2019, 3:18 am

Hi,

How is the calculation for...

Compliance to ASHRAE 90.1-2010- Dimming Lights

CS-v4 EAp2: Minimum Energy Performance
posted by Summer on Aug 14, 2019, 1:03 am

I'm working on an office project located at the top of a 3-level podium and has a 4-level basement parking. The parking slots are not solely for the office tower (office towers are the ones that...

Compliance to ASHRAE 90.1-2010- Dimming Lights

CS-v4 LTc7: Reduced parking footprint
posted by Summer on Aug 14, 2019, 12:57 am

I'm working on an office project located at the top of a 3-level podium and has a 4-level basement parking. The parking slots are not solely for the office tower (office towers are the ones that...

Option A: Luminance, UGR is working?

NC-v4 EQc6: Interior lighting
posted by Marius Dabonneville on Nov 13, 2017, 5:43 am

Hi everyone, 

We're actually working on a project in France. Lighting system suppliers only give us the Photometric curv in cd/klm and no in cd/m². The EN 12464 defines luminance with UGR...

Last reply: Regina Ng, Aug 13, 2019, 11:19 pm

Pumps in LEED Energy Models

CI-v4 EAc2: Optimize Energy Performance
posted by Ciaran McCabe on Aug 13, 2019, 1:48 pm

Hi, Is there a list of the pumps that's should be included in the Proposed Ashrae 90.1 LEED energy model. For example should cold or hot water pressurisation pumps be included? These are not...

Last reply: Marcus Sheffer, Aug 13, 2019, 8:08 pm

Wall Components

NC-v4 EQc2: Low emitting materials
posted by LUCY WILLIAMS on Jun 15, 2017, 10:15 am

When reporting for the wall, ceiling category under Option 1, do all of the interior partition components need to be complaint- the gypsum board, the tape, the joint compound, the studs and the...

Last reply: Kavita K, Aug 13, 2019, 4:44 pm

Quality Views in Non-Regularly Occupied Spaces

Pilot-Credits EQpc117: Quality views in nonregularly occupied spaces
posted by Allison Wilson on Mar 15, 2019, 1:23 pm

In completing the pilot credit survey, I thought the item re: requiring this credit as a prerequisite was interesting. I don't know that this pilot credit would make sense as a prereq, but what...

Last reply: Kim Sosalla-Bahr, Aug 13, 2019, 4:25 pm

Addition to an existing airport terminal

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Ricardo Sá on May 15, 2019, 9:56 am

Dear All,

One of our clients is considering the possibility of certifying an addition to an existing airport terminal and asked us to perform a preliminary...

Last reply: Sandra Arismendi, Aug 13, 2019, 1:26 pm

Monitoring-based Cx for CS projects

CS-v4 EAc1: Enhanced Commissioning
posted by Shannon Oletic on Mar 14, 2019, 3:31 pm

What are the required measurement points for a core and shell project?

Our project is a small core and shell building designed for retail, with limited M+E equipment (ERVs, RTUs, lighting...

Last reply: David Hubka, Aug 13, 2019, 1:09 pm