Topic

Whether or not to include certain existing fixtures within the area of work

CI-v4 WEp1: Indoor water use reduction
posted by Bo White on Jul 15, 2019, 3:17 pm

Our area of work includes portions of the first and second floors of a university library in California. On the first floor, only bathrooms are included. On the second floor, the following space...

Any success with this credit yet?

Pilot-Credits INpc113: Informing Design Using Triple Bottom Line Analysis
posted by Sophie Kerr on Oct 29, 2018, 4:11 pm

forum- There are only a few of us who have commented on this in the LEED User forum so my guess is not many have used this pilot credit it or it's been approved for others without participating in the forum. Log in or register to post comments Elaine Goetz Ohio University LEEDuser Basic Member July 15, 2019- 3:06 pm We also completed this credit using Autocase, but have not yet submitted it.  Participating in the LEED user pilot credit forum (this posting) is one of our last steps before submitting.  I'm glad to see that someone has been awarded this credit with no issues.  Conducting a TBL BCA...

Last reply: Elaine Goetz, Jul 15, 2019, 3:06 pm

LEED ND v4 Pilot Credit Integrative Process- Participation in the Forum

ND-Plan-v4 INc1: Innovation
posted by Charlotte Bodnar on Jul 15, 2019, 12:04 pm

As part of the requirements for this pilot credit, we are noting our participation in the Forum for a project located in Montreal that aims the LEED ND v4 certification.

Since our project...

Last reply: Eliot Allen, Jul 15, 2019, 12:40 pm

LESS rating levels: Design Review-Construction Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by saif eddine majdaoui on Jul 14, 2019, 8:04 am

Hello

Can we ask for fewer design credits at the construction review stage?

for example:
We have tended to get a Silver level in the design stage and we are targeting a...

Last reply: Renee Shirey, Jul 15, 2019, 11:45 am

LEED ND v4 Pilot Credit Integrative Process- Participation in the Forum

Pilot-Credits IPpc101: Integrative process
posted by Charlotte Bodnar on Jul 15, 2019, 10:47 am

As part of the requirements for this pilot credit, we are noting our participation in the Forum for a project located in Montreal that aims the LEED ND v4 certification.

A list of team...

glare-control devices for C&S

CS-v4.1 EQc4: Daylight
posted by Francesco Passerini on Jul 15, 2019, 10:32 am

Hello, the reference guide states: "Provide manual or automatic (with manual override) glare-control devices for all regularly occupied spaces".

Is that mandatory for spaces occupied by...

Base HVAC System for a Data Center / Server Room ASHRAE 90.1- 2007

NC-2009 EAp2: Minimum Energy Performance
posted by Fatou Jabbie, | BSc. Comp. Sci. | MSc. Sustainability Management | LEED AP BD+C on Jul 12, 2019, 3:54 pm

  • Modeling a Data Center: 1,682.34 sq. ft.
  • Call Center: 8,389 sq. ft.
  • Offices: 4,600 sq ft.
  • Common Spaces/Other: 17,126

The data center has an IP load...

Entryway system extends into elevator

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Angela Barreto on Jul 12, 2019, 5:25 pm

Hi,

we have a project with a complying entryway system at ground level. However, the LEED reviewer has pointed out an entryway system is also required at the elevator lobby in our...

REACH registration number

NC-v4 MRc4: Building product disclosure and optimization - material ingredients
posted by Francesco Passerini on Jul 8, 2019, 5:53 am

In safety data sheets the calcium diformat is labeled with REACH registration number 01-2119486476-24-xxxx

Therefore I would think that it is included in the REACH lists but in the REACH...

Last reply: Natalia Kopocinska, Jul 15, 2019, 7:07 am

No Existing and New Fixtures

CI-v4 WEp1: Indoor water use reduction
posted by Simon S. on Jul 11, 2019, 2:58 am

Hi ALL,

Our project is a expansion commercial office, no existing and new fixtures are within the LEED project scope. Should we use the Special Circumstances to meet WEp1 requirement?...

Last reply: Simon S., Jul 14, 2019, 10:40 pm