Is Case 3 available if Case 1 is?

NC-v4.1 EAc4: Grid Harmonization
posted by Vinh Huynh on May 14, 2020, 1:33 am

Can Case 3: Load Flexibility and Management Strategies be pursued if there is...

Last reply: Marcus Sheffer, May 18, 2020, 10:18 am

Zoning in Retail

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Jan Hesse on May 30, 2013, 1:38 am

Toshif, please post your question in the forum for that particular credit. Log in or register to post comments ...

Last reply: Marcus Sheffer, May 18, 2020, 10:01 am

Water efficiency requirements for appliances

NC-v4 WEp2: Indoor water use reduction
posted by Ricardo Sá on May 18, 2020, 9:56 am

Dear All,

 
Credit language of indoor water use reduction prerequisite includes requirements for appliances (dishwashers, clothes washers, etc). If appliances are not labelled by...

WELL v2 W02 Water Contaminant Testing

WELL v1 Building Standard Tip Sheet
posted by Sara Hickman on May 15, 2020, 3:47 pm

For water quality testing, I have found this one that tests for almost everything the standard asks for, with only a couple thresholds being a little different than for the WELL v2 Standard...

Shuttle Schedule

Warehouses-NC-v4 LTc5: Access to quality transit
posted by Ricardo Sá on May 18, 2020, 8:26 am

Dear All,

 
One of our clients is developing a large distribution center inside an industrial site (where some other distribution centers are also located). Expected building...

Change Certification level after Preliminary Design & Construction review

CS-v4 MPR1: Must be in a permanent location on existing land
posted by Miriam Faith Oafallas on May 8, 2020, 5:02 am

Is it allowable that for Preliminary Design & Construction (D&C) submission, the project attempt for example, Silver rating. But after preliminary D&C review/comment, and preparing...

Last reply: Tristan Roberts, May 15, 2020, 3:22 pm

Will a TSCA Title VI Certification Provide Credit for LEED Points?

NC-v4.1 EQc2: Low-emitting materials
posted by Angela Rogers on Oct 5, 2019, 11:48 am

Erica Downs Sustainability Consultant The Green Engineer LEEDuser Premium Member 3 thumbs up January 6, 2020- 11:00 am Hi Angela- I was just looking for the same info.  Hopefully you've received an answer to your question, but just in case, check this thread under NCv4: https://leeduser.buildinggreen.com/forum/us-epa-tsca-title-vi-ulef-products Log in or register to post comments Ralph Bicknese Principal Hellmuth & Bicknese Architects LEEDuser Premium Member 11 thumbs up May 15, 2020- 2:46 pm We have been working on the same issue but have not been able to find a definitive answer. We...

Last reply: Ralph Bicknese, May 15, 2020, 2:46 pm

NC- v4 MRc2 thru MRc4 as they relate to site work and divisions 31 and 32

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Louis Harris on May 15, 2020, 10:17 am

We are looking for direction and help in finding LEED qualifying credits in division 31 and 32.

SRI for a GREENHOUSE

CS-v4 SSc5: Heat Island Reduction
posted by Marion THIBAULT on May 15, 2020, 10:00 am

Hello everyone, I'm working on a project that plans to integrate a greenhouse. I wonder how to consider the roof of the greenhouse for the...

Swimming Pool

NC-v4 WEp2: Indoor water use reduction
posted by Penny Cole on May 11, 2020, 1:18 pm

We are certifying a Rec Centre that includes an indoor pool, in addition to a couple of gym spaces. Does the pool water use need to be included in the indoor water use prerequisite and credit?...

Last reply: Omar Wagdi, May 15, 2020, 6:35 am