Log in
Forum
Loading...
Topic

Future Development

NC-v4 LTc4: Surrounding density and diverse uses
posted by Sofia Barahona on Nov 4, 2019, 9:59 am

We are currently working on a project that achieves a combined...

Last reply: Isir Messo, Feb 20, 2020, 9:22 am

CO2 monitors location

NC-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Isir Messo on Feb 20, 2020, 7:06 am

Hello everybody.

Our client want to install CO2 sensors into the tables (offices), that is below 3 feet above the...

Is it forbidden by the LEED to have à Infrared Taps / sensor taps/automatic Taps

NC-v4 WEp2: Indoor water use reduction
posted by Sara YOUSSOUFI on Feb 20, 2020, 2:50 am

Hello, 

Could you told me if it is forbidden by the LEED standard to put an infrared tap in the toilet?

Thanks,

Lower Flow Restrictor not WS Labelled- Residential Bathroom Faucets

NC-v4 WEp2: Indoor water use reduction
posted by RDK E&S on Nov 4, 2019, 11:00 am

We are got a comment on a residential project where we installed flow restrictors to reduce the faucet flow rate to 0.5 gpm. The 1.5 gpm flow restrictor is WS labelled but the installed 0.5 gpm...

Last reply: Sara YOUSSOUFI, Feb 20, 2020, 2:48 am

Integrated dryer and Water Sense labeled faucet

NC-v4 WEp2: Indoor water use reduction
posted by Elizabeth Floyd on Oct 30, 2019, 12:16 pm

If none of the systems with integrated sink/faucet and hand dryer are available with a Water Sense labeled faucet, does that make the product ineligible for Water Sense labeling? (This is for...

Last reply: Sara YOUSSOUFI, Feb 20, 2020, 2:48 am

Assessment and Planning for Resilience Workbook

:
posted by Valerie Walsh on Jul 1, 2016, 3:42 pm

Just a heads up to project teams: I was completing the Hazard Assessment inputs for our project using the pc Workbook and noticed that a line item for the Drought category needs to added to the...

Last reply: Mary Ann Lazarus, Feb 19, 2020, 4:57 pm

Representative Measurements

CS-v4 EQc4: Daylight
posted by Summer Minchew on Feb 19, 2020, 4:25 pm

Similar to how we would address views in a core and shell project, can Option 3 measurements be conducted based on a representative floor plan(s) or would measurements need to be conducted for...

90.1 Mandatory Provisions

NC-2009 EAp2: Minimum Energy Performance
posted by Charles Daze on Oct 20, 2015, 12:47 pm

Does Appendix G or LEED modeling protocol require the baseline building be modeled with all of the mandatory provisions of Section 6.4? And if so where is this stated?

Appendix G implies...

Last reply: Gustavo De las Heras Izquierdo, Feb 19, 2020, 3:41 pm

EDP documents

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by David Dixon on Dec 28, 2016, 4:54 pm

working on documentation for the credit I am finding that the documentation in EDPs do not translate to the credit matrix and documenting is not smooth

Last reply: Nicole Jenkins, Feb 19, 2020, 2:01 pm

Innovation- Bird Collision Deterrence

NC-v4 INc1: Innovation
posted by Geoffrey Katz on Oct 26, 2017, 11:45 am

For the Pilot Credit Bird Collision Deterrence one requirement is to "Develop a three-year post-construction monitoring plan to routinely monitor the effectiveness of the building and site design...

Last reply: Nicole Jenkins, Feb 19, 2020, 1:49 pm