Topic

Flush-Out Requirement for a Naturally Ventilated Building

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Eric Carbonnier on Feb 5, 2015, 12:00 pm

The project is an 8 story residence hall on a university campus. The building is not equipped with a central ventilation system and dorm rooms rely on natural ventilation. My options appear to be...

Last reply: Tristan Roberts, Mar 19, 2015, 6:43 pm

direct reading instruments

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Kelly Bruvik on Jun 30, 2014, 4:16 pm

Can direct reading instruments be used to measure VOCs and PM10? Another user asked specifically about the GrayWolf...

Last reply: Kathryn West, Feb 27, 2015, 11:23 am

Air Quality Testing after completion

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Mike Stopka on Oct 28, 2014, 6:15 pm

Hello

I have a project that is very close to LEED Gold. I am trying to lock down one more point. The project is in the final phase of the construction submission for LEED. The project...

Last reply: Dave Hubka, Dec 9, 2014, 4:03 pm

Mold Testing Standards

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Susan Walter on Nov 13, 2014, 9:17 am

We have a project and the owner wants to include testing for mold. We had flooding in a project and two AHUs now show signs of mold. The industrial hygenist is cleaning and monitoring those...

Last reply: Susan Walter, Nov 13, 2014, 4:09 pm

SBR and rubber flooring

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Kim Shinn on Apr 7, 2010, 1:57 pm

We have a project with rubber flooring - in a cardiovacular training and weight training room in a fitness center. The rubber floor is synthetic rubber, which contains styrene butadiene rubber...

Last reply: Michele Helou, Nov 11, 2014, 1:03 pm

Credit 3.2 option 2

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Michael Schrantz on Sep 30, 2014, 1:57 pm

To whoever can help me!

I am bidding on a two-story building. The first floor is 33,000 ft.² and the second floor is a little over 18,000 ft.²
Each floor is supplied by outdoor fresh...

Last reply: David Biggs, Sep 30, 2014, 2:41 pm

Comment on Value and Purpose of IEQc3.2

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Dale Walsh on Jul 2, 2014, 12:38 am

As a Certified Industrial Hygienist with 28 years of experience conducting...

Last reply: Dale Walsh, Sep 23, 2014, 9:45 pm

IAQ Flush out-using temporary exhaust systems

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Stella Stella on Aug 8, 2014, 3:54 am

Hi,
We are proposing a...

Testing for Residential

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Donald Green on May 22, 2014, 11:15 am

I have read the threads for this credit as well as any LI that I could find to determine the amount of testing locations required. There is however a conflict of information as follows - a thread...

Last reply: Donald Green, Aug 7, 2014, 10:48 am

IAQ Option #1

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by David Biggs on Jul 9, 2014, 10:14 am

For a building pre-occupancy flush-out what are the requirements for substantiating that the 14,000 cfm of OA was actually completed for the entire square footage. In the past under version 2...

Last reply: Tristan Roberts, Jul 26, 2014, 8:37 am