Log in
Forum » NC-v4 EQc1
Topic

Dedicated Exhaust Fan and Pressure calcalation

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Boggarm Setty on Apr 22, 2019, 4:58 am

1. Interior Cross-Contamination Prevention section requires exhaust from space where hazardous gases or chemicals may be present or used so does this exhaust need to be via dedicated...

Last reply: Bipin Karki, May 16, 2019, 7:36 am

Option 1 Requirements

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Yodi Danusastro on May 10, 2019, 7:15 am

Do we have to meet all the requirement in Option 1 as in mechanically ventilated spaces: A.the Entryway system strategy, B. Interior-cross-contamination prevention, and C. Filtration (...

Last reply: Bipin Karki, May 15, 2019, 2:13 pm

Separation of space requirements if stove is separately vented

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Ann Kelly on Mar 27, 2019, 4:40 pm

All,

If we have an electric residential grade stove, which is separately vented, located in an open break room setting, will this satisfy the requirements for separation of space?

...

BAS required for strategy "C. CO2 Monitoring"

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Gustavo De las Heras Izquierdo on Mar 3, 2019, 5:24 pm

Hi all,

The Reference Guide says:

"C. Carbon Dioxide Monitoring

Monitor CO2...

Enhanced IAQ- EP for 2 strategies under Option 2?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Teresa Stern on Jan 15, 2019, 6:11 pm

We are looking at installing CO2 monitoring at densely occupied spaces. We are also providing a dust collection system...

Last reply: Teresa Stern, Jan 15, 2019, 6:13 pm

final fit-out on tenants request-> designing provisions for negative pressure difficult

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Mark Kumar Bose on Jun 3, 2018, 6:12 pm

Hi,

how do deal with the fact that often the final office floor plans will be fixed later on tenant request so that the technical provisions (negative pressure, etc.) for copy rooms can...

Last reply: Mark Kumar Bose, Jan 14, 2019, 2:56 pm

Cross-contamination prevention: dedicated exhaust system still required?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Luis Andrade on Sep 21, 2018, 4:49 am

Hi,

In order to achieve EQc1 - option 1 do I still need to intall dedicated exhaust systems to all spaces where are hazardous gases are present? In LEED v2009  (IEQc5) this was mandatory....

Last reply: Stephanie Graham, Jan 9, 2019, 12:28 pm

Do outdoor terraces require entrway systems?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Helene Lefkowitz on Dec 26, 2018, 1:45 pm

Hello - I'm working on a commercial project that has an outdoor terrace on the second floor. Building occupants can use the terrace for outdoor seating and there will be a firepit. I submitted a...

Last reply: Dustin Norton, Dec 28, 2018, 9:16 am

Enhanced indoor air quality strategies in wineries

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Ricardo Sá on Nov 16, 2018, 6:47 am

Hi,

we are evaluating the LEED certification potential of a new winery that will be built in Portugal (using the rating system LEED BD+C: New Construction and Major Renovation)....

Carpet Tile as an Entryway System

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by James Keohane on Sep 17, 2018, 1:06 pm

The Reference Guide for EQc1, Option 1- Entryway Systems describes entryway system in part ..…... " rollout mats and any other materials manufactured as entryway systems with...

Last reply: Trista Brown, Oct 17, 2018, 9:08 pm