Log in
Forum » United Arab Emirates
Loading...
Topic

Window to wall ratio

NC-2009 EAp2: Minimum Energy Performance
posted by Annabelle Cruz on Dec 18, 2016, 1:55 am

Hi. As per Section 5c of Table G3.1 of ASHRAE 90.1-2007, “Vertical fenestration areas for new buildings and additions shall equal that in in the proposed design or 40% of gross above-grade wall...

Last reply: Marcus Sheffer, Dec 18, 2016, 9:48 pm

LEED NCv 2009 Multi-Family Residential: Apartment

NC-2009 EAp2: Minimum Energy Performance
posted by junaid naseer on Nov 21, 2016, 3:52 pm

Hi All,

I have seen this point tackled in many comments earlier but we still have some doubts. We have a residential building of 16 floors which sits on a podium of 3 floors. Our issues...

Last reply: Marcus Sheffer, Nov 22, 2016, 12:36 pm

EAc1 points using DES Option 1 + A lot of Renewables

NC-2009 EAc1: Optimize Energy Performance
posted by Reniel Barroso on Aug 11, 2016, 1:54 am

Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5530 thumbs up August 31, 2016- 11:45 am Answered in the EAp2 forum. Log in or register to post comments ...

Last reply: Marcus Sheffer, Aug 31, 2016, 11:45 am

EAc1 Credits Using DES Option 1 + A lot of Renewables

NC-2009 EAp2: Minimum Energy Performance
posted by Reniel Barroso on Aug 11, 2016, 1:28 am

We have a project opting to maximize the 19points of EAc1. The project is served by a District Cooling Plant.

If the project will only use the Option 1 of...

Last reply: Marcus Sheffer, Aug 16, 2016, 12:18 pm

Enhance commissioning

NC-2009 EAc3: Enhanced Commissioning
posted by Mamdooh Amin on Aug 8, 2016, 3:57 am

Do we have to include the contract document between the owner and the...

Last reply: Scott Bowman, Aug 9, 2016, 11:07 am

LEED Development Density and community connectivity

NC-2009 SSc2: Development Density & Community Connectivity
posted by Sherrin Pulickal on Jul 7, 2016, 8:13 am

What does it mean by double the project...

Flat land

ND-Plan-v4 SLLc6: Steep slope protection
posted by Flavia Marques on Nov 16, 2015, 3:19 am

How about if there is no slope can we achieve the credit by default?

Last reply: Eliot Allen, May 26, 2016, 11:25 am

School Building

NC-2009 EAp2: Minimum Energy Performance
posted by Nikhil Kumar on May 25, 2016, 7:42 am

Hi,
We are doing the Energy Model for SCHOOL Building. The client has proposed Air cooled chiller.
Class rooms are served by individual FCU, Meeting rooms are served by split units,...

Last reply: Marcus Sheffer, May 25, 2016, 9:43 am

Rating system for an Existing Office space

LEED Rating System Selection
posted by Shijo John on Feb 3, 2016, 7:30 am

Dear All,

We have an existing office (around 2-3 years old) which we want to get LEED certified. However, it is a part (tenant space) of mixed-use building. It is not clear to me which...

Last reply: Tristan Roberts, Apr 10, 2016, 7:58 am

Need your Advise- Urgent (Sports Hall Project)

NC-2009 EAp2: Minimum Energy Performance
posted by Nikhil Kumar on Feb 11, 2016, 6:31 am

Hi,

We are doing Energy Simulation for Sports Hall Project (G+1 Story building). Sports hall having single playing court and it will be used for various sports activities. Sometimes, it...

Last reply: Marcus Sheffer, Mar 7, 2016, 3:54 pm