Log in
Forum » China
Topic

How to calculate the Tank size

NC-v4 SSc4: Rainwater management
posted by Patrick Y P Lui on Jan 31, 2018, 3:35 am

I am working a hotel project with 6090 sq.m greenery + 14210 sq.m pavement and willing to get 3 points by Percentile of rainfall events (Option 1) - Path 2 98th Percentile.

Information I...

What's the size requirement for a Data Center Project with LEED v4 BC+D and O+M?

EBOM-v4 MPR3: Must comply with project size requirements
posted by Xiaoyu Cao on Nov 2, 2017, 4:00 am

Hi,

I see the minimum size requirements for BD+C and O+M is ,

"LEED BD+C and LEED O+M Rating Systems

The LEED project must include a minimum of 1,000 square...

Last reply: Tristan Roberts, Nov 2, 2017, 12:12 pm

Some questions about temporary parking spaces

NC-v4 LTc7: Reduced parking footprint
posted by Jianzhushe Lili's on Sep 7, 2017, 4:22 am

Dear all:

There are some temporary parking spaces within our project building area,and whether these temporary parking spaces are also within the calculation of parking spaces. In addition...

Last reply: Jianzhushe Lili's, Oct 9, 2017, 6:19 am

Question about ASE study area

NC-v4 EQc7: Daylight
posted by Jackie Cheung on May 4, 2017, 11:04 pm

Hello everyone. May I ask 2 questions about this credit?

A) Assuming a project go for option 1. In...

Last reply: TODD REED, Aug 30, 2017, 2:27 pm

Option 2, Path 9

CI-2009 SSc1: Site Selection
posted by Pui Nang Benny Au on Mar 1, 2016, 1:29 am

My project is in Hong Kong and the host building is using seawater for flushing, (i.e. no potable water is used for sewage conveyance).

Can this point be achieved since I believe the...

Last reply: Tristan Roberts, Aug 26, 2017, 6:45 pm

Landscape Under Covered

NC-2009 SSc5.2: Site development - maximize open space
posted by Anthea Ng on Feb 5, 2017, 8:39 pm

Hello,

My project has a open landscaped G/F partially covered by 2/F...

Last reply: Tristan Roberts, Aug 26, 2017, 5:47 pm

Documentation upload to LEED Online

CS-v4 EAc1: Enhanced Commissioning
posted by Erin Rowe on Jul 7, 2017, 2:51 am

We are just getting ready to submit LEED CI V4...

Last reply: Dave Hubka, Aug 15, 2017, 8:28 pm

n/a

NC-v4 SSc2: Site development - protect or restore habitat
posted by Biao Ma on Jul 23, 2017, 10:32 pm

I want to know if vertical green wall with native and local plant species, whether or not can conribute the green ratio for option 1.

Last reply: Trista Brown, Jul 25, 2017, 7:03 pm

Energy Model for Ice Rink

NC-v4 EAp2: Minimum Energy Performance
posted by Shenhao Li on Jul 5, 2017, 9:50 am

Hello,

We have a speed skating oval project. Should the energy used for ice rink modeled as process load? We think this will be the major energy consumption. Can we consider the energy...

Last reply: Marcus Sheffer, Jul 6, 2017, 9:22 am

Purchased energy rate

CS-v4 EAp2: Minimum Energy Performance
posted by Shenhao Li on Jun 18, 2017, 11:41 am

Hi all,

We have a LEED v4 CS project which use purchased chilled water and purchased heat. According to ASHRAE 90.1-2010 G2.4 "Annual energy costs shall be determined using either actual...

Last reply: Marcus Sheffer, Jun 19, 2017, 9:28 am