Log in
Forum » Asia – South and Southeast
Topic

Standard for the baseline of the cold storage in a factory

NC-v4.1 EAp2: Minimum Energy Performance
posted by Michael on Sep 11, 2022, 1:40 pm

My factory project has cold storage (10oC) and a freezer (-13oC). For the factory, we use ASHRAE 90.1-2016 as normal but for the cold storage and freezer, what is the standard to set up the...

Last reply: Marcus Sheffer, Sep 12, 2022, 7:13 pm

Daylight sensors in a factory with skylight

NC-v4.1 EAp2: Minimum Energy Performance
posted by Michael on Sep 11, 2022, 1:27 pm

My factory project has skylights on the roof and when I told the MEP engineers that they need to install daylight sensors for daylight area under the skylight, they refused as changing the...

Last reply: Marcus Sheffer, Sep 12, 2022, 6:00 pm

Charging for bicycle facilities

NC-v4 LTc6: Bicycle facilities
posted by Gregory Mason on Sep 11, 2022, 11:18 pm

Is anyone aware of any explicit wording in LEEDv4 or v4.1 that explicitly states that bicycle parking needs to be provided free-of-charge? It was mention explicitly in 2009, but it appears that...

Install submeters for a factory with 90% of Process load

NC-v4 EAc3: Advanced Energy Metering
posted by Michael on Aug 31, 2022, 11:44 pm

My project is a factory with more than 90% of energy consumption coming from Process load (for production purposes). HVAC, lighting, pump, and fan all together only account for least than 10% of...

Last reply: Marcus Sheffer, Sep 1, 2022, 12:59 pm

Campus approach: can we install water meter for the entire landscape, sanitaryware as a whole

NC-v4 WEc4: Water metering
posted by Michael on Aug 25, 2022, 5:37 am

My project is a campus project, consisting of 4 individual buildings. To fulfill this credit, can I install 1 meter to monitor sanitaryware for 4 buildings together as a whole? or I have to split...

Last reply: Maeve Donohue, Aug 25, 2022, 9:21 am

need of two excel file to show daylight compliance?

NC-v4 EQc7: Daylight
posted by Alwin Jino on Aug 19, 2020, 6:59 am

As per Version 4.1, IEQ Credit-Daylight: Options 2, Illuminance calculations. 

it is asked to perform daylight simulation for 9 a.m and 3 p.m on a clear-sky day at the equinox. should we...

Last reply: Debra a. Lombard, Aug 24, 2022, 4:39 pm

Solar energy still doesn't count toward to minimum energy reduction in v4?

NC-v4 EAp2: Minimum Energy Performance
posted by Michael on Aug 24, 2022, 7:08 am

My understanding is that LEEDv4.1 allows on-site renewables to count toward compliance in the prerequisite. I'm wondering if LEEDv4 also allows to do so or we still have to reach the minimum...

Last reply: Marcus Sheffer, Aug 24, 2022, 11:52 am

Calculate U-value of exterior wall

NC-v4 EAp2: Minimum Energy Performance
posted by Michael on Aug 23, 2022, 11:55 pm

Regarding the...

Last reply: Marcus Sheffer, Aug 24, 2022, 11:50 am

Is Rainwater Cistern acceptable as LID Techniques?

NC-v4.1 SSc4: Rainwater management
posted by Michael on Mar 21, 2022, 12:11 pm

Hi LEED experts, I read v4.1 "Further explanation", in the first section "Examples of Acceptable...

Last reply: emily reese moody, Aug 22, 2022, 12:09 pm

Two unidentical buildings from same owner/management for what approach?

EBOM-v4 MPR2: Must use reasonable LEED boundaries
posted by Eric Bautista on Aug 14, 2022, 11:45 pm

I would like to emphasize the general details of this project for LEED v4 or v4.1 O+M certification.

There are 2 existing buildings (Building A and B) in a property boundary and these are ...