Topic | Recent |
---|---|
2012 EPA CGP comply with this prerequisite?CS-2009 SSp1: Construction Activity Pollution Preventionposted by Pamela Svetllana Santos Souza on Jul 14, 2017, 7:13 am
I'm modelling for LEED C&S 2009 and the project has 26 floor type of mixed-use offices. Does the 2012 EPA... Last reply: Tristan Roberts, Aug 26, 2017, 6:10 pm |
|
Core & Shell RetrofitCS-v4 SSc1: Site assessmentposted by Juliana Malho on Jun 9, 2017, 9:07 am
I'm wondering if the credit is achievable by retrofit projects. In my case the site is previous developd and 100% imperviousness by the existing construction including parking lots and the... Last reply: Tristan Roberts, Aug 26, 2017, 12:38 pm |
|
Shades and blindsNC-v4 EQc7: Daylightposted by Antonio Macedo Filho on Aug 16, 2017, 1:07 pm
I'm working on an office project, and there's an atrium. We want to use a translucent and permeable tensioning fabric on the roof of this atrium. Could this... Last reply: TODD REED, Aug 17, 2017, 10:41 am |
|
ViewsNC-2009 IEQc8.2: Daylight and views - viewsposted by Antonio Macedo Filho on Aug 16, 2017, 4:31 pm
I would like to know if there is a maximum obstruction height of views for option 1. In the case in my project, if it is an office building, with a central atrium and in that atrium, we would... Last reply: TODD REED, Aug 17, 2017, 9:29 am |
|
BrownfieldCS-v4 LTc3: High priority siteposted by Antonio Macedo Filho on Jun 23, 2017, 12:32 pm
Hi Tristan, I have a project in a... Last reply: Tristan Roberts, Jul 7, 2017, 4:37 pm |
|
Brazilian Equivalent StandardCS-2009 EAp2: Minimum Energy Performanceposted by Pamela Svetllana Santos Souza on Jun 14, 2017, 11:50 am
Hello, I'm modelling for LEED C&S 2009. The project has 26 floor type of mixed-use offices. My question is about the Minimum Energy Perfomance credit (EAp2) and equivalent standards... |
|
Anti Smoking SignNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Marcelo Maciel de Santa Helena on Dec 18, 2015, 12:13 pm
We have a question about the location of the anti smoking signs. Last reply: James Bell, Apr 21, 2017, 2:05 pm |
|
Obtaining the creditCS-2009 SSc2: Development Density and Community Connectivityposted by Paulo Patrício on Mar 28, 2017, 2:25 pm
Hi. Last reply: Allison Smith, Mar 29, 2017, 12:48 pm |
|
AHUs unable to meet case 1 or case 2EBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Patrick Murisset on Jul 14, 2016, 12:45 pm
Hello. I coordinated a project in which the IEQp1 was audited. There were a few AHUs that did not comply with the ASHRAE 62.1-2007 neither the 10 cfm/person, others do; this situation was... Last reply: Ben Stanley, Mar 8, 2017, 7:01 pm |
|
ieqc8.1 x ieqc 8.2NC-2009 IEQc8.2: Daylight and views - viewsposted by GISELA FARHAT DE ARAUJO on May 16, 2016, 12:04 pm
to achieve this credit we must have won the ieqc8.1 credit? or credits are independent? Last reply: Tristan Roberts, Jan 18, 2017, 12:21 am |