Electric Charging Stations out of Leed Boundary

NC-v4 LTc8: Green vehicles
posted by Jorge Lopez de Obeso on Sep 3, 2021, 3:15 pm

Hi !

Leed v4:

Is it possible to have electric charging station out of the Leed Boundary ?  This secundary parking lot, where the charging stations are, provides service to the whole...

Last reply: Afogreen Build, Sep 13, 2021, 2:58 am

MERV 11

NC-v4 EQp1: Minimum indoor air quality performance
posted by Gustavo De las Heras Izquierdo on May 17, 2017, 12:48 pm

Hallo,

In an office building located in Mexico City (a location with a high PM2.5 and ozone levels), the floors are served by AHU’s equipped with...

Last reply: Olman Joaquin Ledezma Unzueta, May 11, 2021, 10:54 am

Strategies

Pilot-Credits SSpc55: Bird collision deterrence
posted by Carolina Vasquez on Jun 4, 2020, 1:00 pm

Hi, 

We have implemented additional strategies at our office with regards to the bird collision detterrence monitoring program but we have registered a couple of bird strikes. I would like...

Last reply: Michelle Cordero, Apr 28, 2021, 12:43 pm

Enclosed Parking Garage Ventilation

CS-2009 EAp2: Minimum Energy Performance
posted by Gabriela Mena on Oct 27, 2020, 10:33 am

Hi, 

We are working on a CS V2009 project that is willing to control the parking garage ventilation by detecting contamination levels. According to ASHRAE 90.1-2010, the airflow...

Last reply: Tyler Thumma, Nov 6, 2020, 9:14 am

Minimun rate ventilation for enclosed parking with contaminant sensors

CS-2009 IEQp1: Minimum indoor air quality performance
posted by Hendrick Munoz on Oct 28, 2020, 12:23 pm

Goord morning, 

I have a question regarding the minimum rate ventilation for enclosed parkings. For our project, we have an exhaust system for the enclosed parking that has a contaminant...

Documentation Option 1

Pilot-Credits IPpc89: Social equity within the community
posted by Carolina Martinez on Aug 17, 2020, 2:54 pm

Our project finished SEED evaluator parts 1 and 2, the only mail we received from them is a blank mail indicating that the project is approved to move forward to part 3. Is this email enough as...

Biodigestion process instead of composting

ND-Plan-v4 GIBc16: Solid waste management
posted by LEED Pro Consultant on Jul 27, 2020, 10:58 am

We are trying to achieve the GIB - Solid Waste Management.

The project will have recycling stations, a drop-off point for hazardous waste, and recycling containers every 245m. ...

Last reply: Eliot Allen, Jul 27, 2020, 11:53 am

Full Occupancy Calculations

EBOM-v4 EQp1: Minimum indoor air quality performance
posted by Giovani Bernal on Jun 1, 2020, 11:58 pm

Our project is a 24 level office building. At least 75% of occupancy has been reached.

According to LEED Compliance Guide, for EQ Prerequisite Minimum Indoor Air Quality Performance, for...

Last reply: Patrick Murisset, Jun 16, 2020, 3:15 pm

Retail Terrace

EBOM-v4 SSc4: Light Pollution Reduction
posted by Jorge Lopez de Obeso on Apr 22, 2019, 3:07 pm

Hello everyone, We are working on a project attempting option 2: Perimeter measurements. 

How should exterior lighting in terraces from retail should be addressed? specifically in this...

Last reply: Bill Swanson, May 8, 2020, 9:27 am

Gross floor area modification

CS-2009 PIf2: Project Summary Details
posted by Silvia Ruiz on Apr 18, 2017, 1:43 pm

Hi

If a project size is modified (the...

Last reply: Edgar Arevalo, May 5, 2020, 12:59 pm