Log in
Forum
Loading...
Topic

Regional material purchase

NC-2009 MRc5: Regional Materials
posted by Nikita Jayswal on Jul 5, 2019, 9:40 am

Hello,

We have a Project in Germany where the contractor wants to know if the material which if purchased from a local distributor would count towards the credit or would we have to go...

Last reply: Richard Metts, Jul 10, 2019, 10:07 am

Lighting control (occupancy sensor)

CS-2009 EAc1: Optimize Energy Performance
posted by Christophe Boussuge on Jun 28, 2019, 10:23 am

Hi all,

I had review back for my ASHRAE 90.1-2007 model for a LEED project (office building) and would need some advice on how to address the subject.

In the first submission of the...

Last reply: Christophe Boussuge, Jul 10, 2019, 2:51 am

Off-site still available?

NC-v4 SSc3: Open space
posted by Abigail Chan on Jun 19, 2019, 4:36 pm

In previous versions of LEED, it seems as if the open space credit allowed for project developers to improve/restore off-site areas to achieve this credit (with 2 square feet offsite = 1 square...

Last reply: emily reese moody, Jul 9, 2019, 10:19 pm

Diverse uses outside the project boundary/ tenant fitout area but within the same building

CI-v4 LTc2: Surrounding density and diverse uses
posted by Ranya Metwalli Shields on Jul 4, 2019, 8:53 am

Our project is a retail tenant located within a mall. I was wondering whether shops/ restaurants within the same mall where our projectis located but outside the project boundary/ tenant fitout...

Last reply: Mara Baum, Jul 9, 2019, 7:06 pm

FAR Requirement

NC-v4.1 SSc3: Open space
posted by Jesse Hunt on Jul 9, 2019, 4:29 pm

It appears that the v4.1 language for the credit omits the...

Last reply: Jesse Hunt, Jul 9, 2019, 4:30 pm

Spray foam fireproofing = "fire-proofing coatings" per SCAQMD Rule 1113?

NC-v4 EQc2: Low emitting materials
posted by Renee Shirey on Jun 26, 2019, 6:57 pm

Does anyone know for sure how spray foam fireproofing (for structural steel members) is categorized for...

Last reply: Deborah Lucking, Jul 9, 2019, 4:14 pm

Smoking in Hotel Rooms in a Hospitality project

Hospitality-NC-v4 EQp2: Environmental tobacco smoke control
posted by shashank gangil on Jan 27, 2019, 9:41 pm

We have been asked this question from a hotel who wants to go for LEED V4 Certification. As per LEED V4, no smoking is allowed inside the building but some concessions have been provided for...

Last reply: Joseph Snider, Jul 9, 2019, 3:18 pm

Does this Pilot ACP work for the v4.1 version of Raw Material Extraction?

Pilot-Credits MRpc102: Legal Wood
posted by Nadav Malin on Jul 9, 2019, 8:31 am

The relevant requirements in the v4.1 version of the credit are basically the same, so it would be easy to see how this ACP could apply, but the v4.1 credit is structured differently (no more...

Last reply: David Hubka, Jul 9, 2019, 3:04 pm

Counting diverse use categories.

NC-v4 LTc4: Surrounding density and diverse uses
posted by Keith Robertson on Apr 19, 2019, 9:20 am

The reference guide states that "The counted uses must represent at least three of the five categories, exclusive of the building’s primary use."

Our reviewer has interpreted that to mean...

Last reply: Deborah Lucking, Jul 9, 2019, 12:41 pm

Anyone been through full review of this credit yet?

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by Joanna Switzer on Oct 26, 2017, 2:57 pm

Just curious if anyone has lessons learned on this one yet?

I am researching feasibility/ realistic attainability of this credit. I noticed Sherwin Williams has created some...

Last reply: Summer Minchew, Jul 9, 2019, 11:06 am