Log in
Forum
Loading...
Topic

LEED v4.1 makes changes for commingled waste in Option 1- What do you think?

NC-v4 MRc5: Construction and demolition waste management
posted by Michelle Reott on Jan 23, 2019, 3:21 pm

I'm hopeful that everyone on this forum has seen the BD+C LEED v4.1 new language for MRc5 regarding...

Last reply: ragesh ramadas, Jul 16, 2019, 9:17 am

E-Jeepneys

NC-v4 LTc5: Access to quality transit
posted by Summer on Jul 16, 2019, 1:00 am

Does E-Jeepney transpo counted on this credit? I haven't seen any explanation on the reference guide regarding electric transpo.

Actually this E-Jeepneys has a terminal near the project...

Last reply: David Hubka, Jul 16, 2019, 9:05 am

Pilot Credit 82: Local Food Production as Innovation Credit

EBOM-v4 INc1: Innovation
posted by Kay Rix on May 28, 2019, 4:27 am

Trista Little Senior Consultant, WSP USA LEEDuser Expert 363 thumbs up July 15, 2019- 6:50 pm Hi Kay, there's a new Pilot Credit section of LEEDuser that you can navigate to using the credit selector. PC82 is here:  https://leeduser.buildinggreen.com/credit/Pilot-Credits/SSpc82#tab-bev. There's overview information, the specific credit requirements by rating system, and a discussion forum. If you have questions after reviewing that info, you may want to contact LEED Coach to run your strategy by them for input.  For your second question, here's the list of WELL features that can be used...

Last reply: Trista Little, Jul 15, 2019, 6:50 pm

Third Party Products

EBOM-v4 MRc1: Purchasing - ongoing
posted by Alex Goulden on Jul 2, 2019, 3:18 pm

Hello, 

Some of the food products in our building are purchased by outside companies such as the vending machine food. Do these products count as ongoing consumables under this credit,...

Last reply: Trista Little, Jul 15, 2019, 6:32 pm

Views Documentation- Supplementing Sectional Drawings

EBOM-2009 IEQc2.4: Daylight and Views
posted by Rene Brana on Aug 21, 2012, 11:24 am

So I have a similar issue as what Simon above described. I am working on the LEED:EB certification of a multi-tenant commercial high-rise in a densely populated urban environment. The issue we...

Last reply: Trista Little, Jul 15, 2019, 6:22 pm

Occupant feedback

EBOM-2009 IEQp3: Green Cleaning Policy
posted by Judy Bethuy on Jul 11, 2019, 3:00 pm

Occupant Feedback:

  1. Occupant feedback will be collected annually to ensure that green housekeeping products and procedures implemented at ____ do not inhibit or impair...

Last reply: Trista Little, Jul 15, 2019, 6:09 pm

Location Valuation Factor

NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by Shannon Oletic on Jul 15, 2019, 6:01 pm

Hello, 

Do all components of a product have to comply with the 160km sourcing requirements in order to apply the location valuation factor in v4? For example, if the recycled scrap within...

Recycling treated lumber or plywood?

NC-v4 MRp2: Construction and demolition waste management planning
posted by Renee Shirey on Jul 15, 2019, 5:19 pm

Has anybody found a way to recycle/divert plywood or other engineered...

LEED v4.1 Daylight ASE Requirement

NC-v4.1 EQc7: Daylight
posted by Baha Sadreddin on Jul 15, 2019, 1:59 pm

Hi everyone,

Do the changes to the daylight credit in LEED v4.1 mean that...

Lowest flow shower on the market

NC-v4 WEp2: Indoor water use reduction
posted by Sophie Kerr on Jul 15, 2019, 4:52 pm

What is the lowest flow shower you've come across? The lowest we have is 5.7 LPM (1.5 GPM).