Topic | Recent |
---|---|
Plug loads for server roomsNC-2009 EAp2: Minimum Energy Performanceposted by MARCIO OROFINO on Apr 22, 2015, 4:39 pm
Hi. Last reply: NANDA GOWRI, Nov 27, 2019, 8:55 pm |
|
Major Renovation or EBOM?LEED Rating System Selectionposted by Christine Recke on Jun 24, 2019, 5:16 am
We intend to certify an existing office building which is going to be renovated with the following criteria:
Last reply: David Posada, Nov 27, 2019, 4:26 pm |
|
Baseline building: daylight controlsNC-v4 EAp2: Minimum Energy Performanceposted by Ricardo Sá on Oct 3, 2017, 8:11 am
Hi, my question is related with the need to consider (or not) daylight controls in baseline building. Table G3.1 (bullet 6) from ASHRAE 90.1-2010 states the following: 1) Proposed... Last reply: Keith Robertson, Nov 27, 2019, 2:57 pm |
|
Monitoring NOT req if ventilation systems are not within scope of work?CI-v4 EQp1: Minimum indoor air quality performanceposted by RDK E&S on Nov 27, 2019, 1:12 pm
I'm wondering if my understanding of the ID+C reference manual (pg 311) is correct: no airflow monitoring equipment is needed if the ventilation system isn't in the scope of work? Has anyone... |
|
Purchasing Lamps CalculatorEBOM-v4 MRc2: Purchasing - lampsposted by Jorge López de Obeso on Nov 27, 2019, 1:05 pm
Hi, I used the current calculator that is on this site but I found out it goes to the max mercury content per bulb instead of the average of the building. So I have three options: ... Last reply: Jorge López de Obeso, Nov 27, 2019, 1:07 pm |
|
Clarify requirement for design review prior to 50% CDsNC-v4.1 EAp1: Fundamental commissioning and verificationposted by Gail Vittori on Nov 27, 2019, 10:07 am
Is it the case that in v4.1, the requirement for a review of the design documents prior to 50% CDs, added with addenda to LEED v4, is no longer a requirement for EAp Fundamental CX in v4.1, but... |
|
Parking Under Cover and SRI RequirementNC-v4 SSc5: Heat Island Reductionposted by Summer on Oct 9, 2019, 4:35 am
Hi, Our project have a 100% parking space under cover which means we are okay with option 2. Do we need to comply with... Last reply: Eric Anderson, Nov 27, 2019, 10:06 am |
|
Will RECs from TIGR fulfill the credit requirement for EAc4 LEED CI v2009?CI-2009 EAc4: Green Powerposted by Rowena Rawte on Nov 25, 2019, 11:23 pm
For a project in Singapore the client are planning on purchasing Green RECs from TIGR. The Tradable Instrument for Global Renewables (TIGR) Registry is an online platform for tracking and... |
|
SCAQMD 1168 and CDPH v1.1NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Samantha Lee on Nov 26, 2019, 4:23 pm
If a product meets the... Last reply: Susan Di Giulio, Nov 26, 2019, 7:35 pm |
|
LEED O+M for Commercial InteriorsLEED Rating System Selectionposted by Geraldine Seguela RAIA on Aug 7, 2019, 11:22 pmon using whole building energy/water and only tenant space IAQ, etc.? Happy to shift to another question/forum as well. Thanks! Log in or register to post comments Tristan Roberts Technical Director... Last reply: Tristan Roberts, Nov 26, 2019, 3:14 pm |